WELL · 42-505-34229 · DISTRICT 4

Bruni Ranch #75

Y

Zapata County · Blancas Creek (10850) field · Producing  · Vertical

Bruni Ranch #75 (API 42-505-34229) is a well in Zapata County operated by Hilcorp Energy Company, completed October 17, 2001 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2000 and 2001, permitted to 12,200 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jan 2026
Latest permitConoco Inc.Sep 12, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,200
total depth, ft
2
permits on file
Sep 12, 2001
last permit issued
Oct 17, 2001
completed
0
cumulative oil, bbl
304K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 17, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bruni Ranch G-4-180582LA Perla (Lobo Cons.)Hilcorp Energy Company1051.9KJan 2001 – Jul 2026
Bruni Ranch G-4-186639Blancas Creek (10850)Hilcorp Energy Company10252KOct 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 2,460 · prior 12 3,755(-34%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jan 2001 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513531-99RecompletionConoco Inc.Sep 12, 2001Sep 12, 2001Oct 4, 200111,300
500730-99DrillConoco Inc.Oct 13, 2000Oct 13, 2000Nov 16, 200012,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-180582————
—— G-4-186639————

Formation tops

As filed on W-2/G-1. Subsea from 452 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX 80809,500-9,048
WilcoxBASE OF LOWER WILCOX9,795-9,343
Wills Point11,145-10,693

Perforations

Perforated and open-hole intervals.

FromToType
9,5189,528Perforated
9,5409,572Perforated
10,76210,780Perforated
10,76210,860Perforated
10,78610,806Perforated
10,84010,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62552812.25225 S
77,4818.75205 S
4.511,2946.25412 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2002Jan 16, 2002Yes
00Feb 1, 2002——
00Apr 4, 2001Jan 17, 2001Yes
00Feb 6, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534229, documented in the API reference.