WELL · 42-505-35782 · DISTRICT 4
Slator Ranch #41
Zapata County · Las Ovejas (Lobo) field · Vertical
Slator Ranch #41 (API 42-505-35782) is a well in Zapata County operated by Wagner Oil Company, completed June 15, 2010.
The RRC has issued 2 drilling permits between 2007 and 2017, permitted to 11,500 ft.
Completion filings report 4 formation tops, including Carrizo, Wilcox, Pok-A-Dot, Lobo.
No lease production has been reported under this well’s leases.
Operator of record
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Oil Company |
| Production reports | Wagner Oil Companythrough Sep 2023 |
| Latest permit | Wagner Oil CompanyMay 3, 2017 |
- 11,500
- total depth, ft
- 2
- permits on file
- May 3, 2017
- last permit issued
- Jun 15, 2010
- completed
- 0
- cumulative oil, bbl
- 1.27M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 15, 2010
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slator Ranch G-4-282575 | Stirling (Wilcox Consolidated) | Bordertown Energy Resources, LLC | 1 | 0 | 6.46K | Jul 2017 – Jul 2026 |
| Slator Ranch G-4-226809 | Las Ovejas (Lobo) | Wagner Oil Company | 1 | 0 | 1.26M | Apr 2007 – Aug 2017 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wagner Oil CompanyApr 2007 → Sep 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 826026-99 | Recompletion | Wagner Oil Company | Apr 28, 2017 | May 3, 2017 | Jun 27, 2017 | 11,500 |
| 631704-99 | Drill | Wagner Oil Company | Jan 9, 2007 | Jan 12, 2007 | Feb 21, 2007 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-226809 | — | — | — | — |
| — | — G-4-282575 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 563 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,066 | 9,070 | Perforated |
| 9,078 | 9,084 | Perforated |
| 9,094 | 9,102 | Perforated |
| 10,656 | 10,676 | Perforated |
| 10,656 | 10,784 | Perforated |
| 10,686 | 10,690 | Perforated |
| 10,706 | 10,784 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 754 | 12.25 | 383 S |
| 7 | 8,248 | 8.75 | 730 S |
| 4.5 | 11,500 | 6.125 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 10, 2017 | Sep 12, 2017 | Yes |
| 00 | Feb 27, 2012 | Sep 6, 2011 | — |
| 00 | May 29, 2007 | May 15, 2007 | Yes |
| 00 | May 25, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-35782 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-35782 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50535782, documented in the API reference.