WELL · 42-505-35793 · DISTRICT 4

Zachry #4

Y

Zapata County · Big Mac (6470) field · SWR-10-Well  · Vertical

Zachry #4 (API 42-505-35793) is a well in Zapata County operated by Bordertown Energy Resources LLC, completed July 2, 2007 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits in 2007, permitted to 12,000 ft.

It was permitted by El Paso E&P Zapata, L.P. and has since transferred to Bordertown Energy Resources LLC on the wellbore schedule.

Completion filings report one formation top, including Lobo.

No lease production has been reported under this well’s leases.

Operator of record

Bordertown Energy Resources LLC

Permitted by EL Paso E&P Zapata, L.P.; the EWA schedule now lists a different operator.

Bryan, TX · P-5 Y, filed Aug 4, 2025 · 2 permits on file · (956) 614-0250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBordertown Energy Resources LLC
Production reportsBordertown Energy Resources, LLCthrough Apr 2026
Latest permitEL Paso E&P Zapata, L.P.Jul 14, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Jul 14, 2007
last permit issued
Jul 2, 2007
completed
0
cumulative oil, bbl
255K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 2, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Zachry G-4-226460Cisco-Benavides (Lobo Cons.)Bordertown Energy Resources, LLC10255KMar 2007 – Jul 2026
Zachry G-4-230671Big Mac (6470)Bordertown Energy Resources, LLC100Jul 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 617 · prior 12 392(+57%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E&P Zapata, L.P.Mar 2007 → Dec 2010
  2. 2EL Paso E & P Company, L. P.Jan 2011 → Jul 2012
  3. 3EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  4. 4Cantera Operating, LLCNov 2013 → Aug 2016
  5. 5Beehive Operating, LLCOct 2016 → Aug 2022
  6. 6Bordertown Energy Resources, LLCJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
641868-99RecompletionEL Paso E&P Zapata, L.P.Jul 3, 2007Jul 14, 2007Jun 20, 200712,000
632255-99DrillEL Paso E&P Zapata, L.P.Jan 22, 2007Jan 24, 2007Feb 1, 200712,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-226460————
—— G-4-230671————

Formation tops

As filed on W-2/G-1. Subsea from 431 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo8,574-8,143

Perforations

Perforated and open-hole intervals.

FromToType
6,4146,430Perforated
8,5748,616Perforated
8,57410,074Perforated
8,9488,954Perforated
9,0089,036Perforated
10,05810,074Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62576012.25400 S
76,2778.75500 S
77,2378.75500 S
4.510,3006.125385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 15, 2007Sep 17, 2007—
00Nov 7, 2007——
00Aug 9, 2007Jul 31, 2007—
00May 18, 2007Apr 24, 2007Yes
00May 4, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535793, documented in the API reference.