WELL · 42-505-36049 · DISTRICT 4

EL Clareno #12ST

Y

Zapata County · Roleta (Wilcox Consolidated) field · Producing  · Directional

El Clareno #12ST (API 42-505-36049) is a well in Zapata County operated by Merit Energy Company, completed September 27, 2008 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2007 and 2008, permitted to 11,800 ft.

It was permitted by El Paso E&P Zapata, L.P. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Roleta B, Roleta C.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by EL Paso E&P Zapata, L.P.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 1,049 permits on file · (972) 628-1559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEL Paso E&P Zapata, L.P.Sep 6, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,800
total depth, ft
3
permits on file
Sep 6, 2008
last permit issued
Sep 27, 2008
completed
0
cumulative oil, bbl
1.91M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 27, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
EL Clareno G-4-245802Roleta (Wilcox Consolidated)Merit Energy Company101.91MMar 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 48,431 · prior 12 27,519(+76%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E&P Zapata, L.P.Mar 2008 → Dec 2010
  2. 2EL Paso E & P Company, L. P.Jan 2011 → Jul 2012
  3. 3EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  4. 4Cantera Operating, LLCNov 2013 → Nov 2017
  5. 5Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
669286-98RecompletionEL Paso E&P Zapata, L.P.Jul 30, 2009Sep 6, 2008Aug 20, 200811,800
669286-99RecompletionEL Paso E&P Zapata, L.P.Aug 18, 2008Sep 6, 2008—11,800
651443-99DrillEL Paso E&P Zapata, L.P.Dec 14, 2007Dec 19, 2007Feb 26, 200811,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-245802————

Formation tops

As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →

FormationMD ftSubsea
Roleta B8,870-8,525
Roleta C9,370-9,025

Perforations

Perforated and open-hole intervals.

FromToType
8,8278,851Perforated
8,9268,942Perforated
9,0709,084Perforated
9,0979,110Perforated
9,6409,650Perforated
9,7049,710Perforated
9,8489,886Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62575112.25315 S
77,5568.75355 S
4.510,0006.125325 S
2.87510,0003.87565 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 16, 2009Dec 10, 2008Yes
00Apr 1, 2009Apr 23, 2008Yes
00Mar 23, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50536049, documented in the API reference.