WELL · 42-505-36125 · DISTRICT 4
Degarza #1
Zapata County · Fandango (Wilcox Consolidated) field · Producing · Vertical
Degarza #1 (API 42-505-36125) is a well in Zapata County operated by Central Gulf Petroleum Inc, completed July 3, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 19, 2008, permitted to 15,500 ft.
It was permitted by Whitson, James A., JR. and has since transferred to Central Gulf Petroleum Inc on the wellbore schedule.
Completion filings report 2 formation tops, including Q Sand, R Sand.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Whitson, James A., Jr.; the EWA schedule now lists a different operator.
The Woodlands, TX · P-5 Y, filed Apr 4, 2026 · 10 permits on file · (512) 595-6469
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Central Gulf Petroleum Inc |
| Production reports | Central Gulf Petroleum Incthrough Feb 2026 |
| Latest permit | Whitson, James A., Jr.Mar 19, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,500
- total depth, ft
- 1
- permits on file
- Mar 19, 2008
- last permit issued
- Jul 3, 2008
- completed
- 0
- cumulative oil, bbl
- 6.67M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 3, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Degarza G-4-241978 | Fandango (Wilcox Consolidated) | Central Gulf Petroleum Inc | 1 | 0 | 6.67M | Jul 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,767 · prior 12 1,575(+12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Whitson, James A., Jr.Sep 2008 → Aug 2010
- 2White Oak Operating Company LLCSep 2010 → Jul 2013
- 3Escudo Oil & Gas, LLCAug 2013 → Mar 2022
- 4Central Gulf Petroleum IncDec 2024 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 656788-99 | Drill | Whitson, James A., Jr. | Mar 6, 2008 | Mar 19, 2008 | Mar 16, 2008 | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-241978 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 485 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Q Sand | 12,362 | -11,877 |
| R Sand | 13,650 | -13,165 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,684 | 13,926 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,282 | 16 | 621 S |
| 9.625 | 8,452 | 12.25 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 24, 2008 | Aug 28, 2008 | Yes |
| 00 | Nov 12, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-36125 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-36125 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50536125, documented in the API reference.