WELL · 42-505-36244 · DISTRICT 4
Johnson Mary M. Trust #1
Zapata County · LA Perla (Lobo Cons.) field · Vertical
Johnson Mary M. Trust #1 (API 42-505-36244) is a plugged well in Zapata County, plugged January 19, 2010, last operated by El Paso E & P Company L. P..
The RRC has issued one drilling permit, issued August 2, 2008, permitted to 14,000 ft.
It was permitted by El Paso E&P Zapata, L.P. and has since transferred to El Paso E & P Company L. P. on the wellbore schedule.
Completion filings report 3 formation tops, including Perdido, Lobo Uncomformity, Lobo 6.
Operator of record
Permitted by EL Paso E&P Zapata, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 6, 2015 · 582 permits on file · (713) 420-2600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Paso E & P Company L. P. |
| Production reports | EL Paso E&P Zapata, L.P.through Oct 2008 |
| Latest permit | EL Paso E&P Zapata, L.P.Aug 2, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- Aug 2, 2008
- last permit issued
- Sep 7, 2008
- completed
- 0
- cumulative oil, bbl
- 5.99K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2008 THROUGH Jan 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 7, 2008
- Shut in
- —
- Plugged
- Jan 19, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson, Mary M. Trust G-4-244985 | LA Perla (Lobo Cons.) | EL Paso E&P Zapata, L.P. | 1 | 0 | 5.99K | Sep 2008 – Jan 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso E&P Zapata, L.P.Sep 2008 → Oct 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 667060-99 | Drill | EL Paso E&P Zapata, L.P. | Jul 18, 2008 | Aug 2, 2008 | Aug 8, 2008 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-244985 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 526 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Perdido | 9,430 | -8,904 |
| Lobo Uncomformity | 10,400 | -9,874 |
| Lobo 6 | 11,830 | -11,304 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,027 | 12,156 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 746 | 12.25 | 315 S |
| 7 | 8,500 | 8.5 | 355 S |
| 4.5 | 12,410 | 6.125 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 2009 | Nov 24, 2008 | Yes |
| 00 | Feb 19, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-36244 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-36244 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50536244, documented in the API reference.