WELL · 42-505-36280 · DISTRICT 4

Lopez Mineral Trust #1

Y

Zapata County · Cisco-Benavides (Lobo Cons.) field · Producing  · Directional

Lopez Mineral Trust #1 (API 42-505-36280) is a well in Zapata County operated by Hilcorp Energy Company, completed April 7, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 16, 2008, permitted to 10,700 ft.

It was permitted by Forest Oil Permian Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Lobo 3, Lobo 6, Cretaceous.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Forest Oil Permian Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitForest Oil Permian CorporationSep 16, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
2
permits on file
Sep 16, 2008
last permit issued
Apr 7, 2009
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 7, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lopez Mineral Trust G-4-247490Cisco-Benavides (Lobo Cons.)Hilcorp Energy Company101.25MFeb 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 8,310 · prior 12 356(+2234%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil Permian CorporationFeb 2009 → Nov 2012
  2. 2Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
669996-98DrillForest Oil Permian CorporationOct 15, 2008Sep 16, 2008Dec 17, 200810,700
669996-99DrillForest Oil Permian CorporationAug 27, 2008Sep 16, 2008—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-247490————

Formation tops

As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo 39,418-8,973
Lobo 69,600-9,155
Cretaceous9,855-9,410

Perforations

Perforated and open-hole intervals.

FromToType
8,0038,022Perforated
8,0328,035Perforated
8,0478,051Perforated
8,1128,124Perforated
8,2568,266Perforated
8,2788,290Perforated
8,3208,330Perforated
9,6209,640Perforated
9,8769,886Perforated
9,9009,912Perforated
9,9449,964Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62575412.25350 S
76,0118.75300 S
3.510,2006520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 2009Apr 23, 2009—
00Jun 18, 2009Mar 18, 2009Yes
00Jun 1, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.