WELL · 42-505-36290 · DISTRICT 4

Las Presas-Garcia A #5

Y

Zapata County · Urebeno South (Wilcox 5900) field · Producing  · Vertical

Las Presas-Garcia A #5 (API 42-505-36290) is a well in Zapata County operated by Hilcorp Energy Company, completed December 1, 2008 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2008 and 2009, permitted to 7,500 ft.

It was permitted by Forest Oil Permian Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Lobo Unc, Lobo Fill Base.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Forest Oil Permian Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitForest Oil Permian CorporationJan 27, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Jan 27, 2009
last permit issued
Dec 1, 2008
completed
0
cumulative oil, bbl
166K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 1, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Las Presas-Garcia "A" G-4-242348Urebeno, South (Wilcox 7000)Hilcorp Energy Company1015.5KOct 2008 – Jul 2026
Las Presas-Garcia "A" G-4-244509Urebeno, South (Wilcox 5900)Hilcorp Energy Company10151KDec 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 3,520 · prior 12 4,332(-19%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Forest Oil Permian CorporationOct 2008 → Nov 2012
  2. 2Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
677339-99RecompletionForest Oil Permian CorporationJan 13, 2009Jan 27, 2009Sep 30, 20087,500
670350-99DrillForest Oil Permian CorporationSep 3, 2008Sep 19, 2008—7,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-242348————
—— G-4-244509————

Formation tops

As filed on W-2/G-1. Subsea from 371 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE MIDDLE WILCOX5,562-5,191
Lobo Unc6,136-5,765
Lobo Fill Base6,586-6,215

Perforations

Perforated and open-hole intervals.

FromToType
5,5395,542Perforated
5,5485,554Perforated
6,5266,536Perforated
6,5416,543Perforated
6,6846,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62580012.25329 S
75,1358.75438 S
3.57,1736.25380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 11, 2009Jan 16, 2009—
00Jan 31, 2009——
00Dec 11, 2008Nov 18, 2008Yes
00Nov 24, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50536290, documented in the API reference.