WELL · 42-507-00575 · DISTRICT 1
Ware, Alpha #104
Zavala County · Vertical
Ware, Alpha #104 (API 42-507-00575) is a permitted well in Zavala County filed by Spur Operating CO.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1996 and 2002, permitted to 3,391 ft.
Its 2 leases have reported 217K barrels of oil and 225K mcf of gas since January 1993, last reporting in July 2026. The leases carry 25 wells, so these are lease totals, not this well alone.
Operator of record
Austin, TX · P-5 Y, filed Aug 2, 2013 · 13 permits on file · (512) 560-8316
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Silver Rock Energy, LLCthrough Feb 2025 |
| Latest permit | Spur Operating Co.Oct 24, 2002 |
- 3,391
- total depth, ft
- 3
- permits on file
- Oct 24, 2002
- last permit issued
- —
- completed
- 217K
- cumulative oil, bbl
- 225K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 25 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ware, Alpha O-1-2421 | Torch (King) | Silver Rock Energy, LLC | 24 | 202K | 131K | Jan 1993 – Jul 2026 |
| Ware, Alpha O-1-14047 | Torch (San Miguel G) | Silver Rock Energy, LLC | 1 | 15K | 93.9K | Feb 1996 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 312(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oakland Petroleum Oper Co., Inc.Jan 1993 → Oct 1995
- 2Koven Production Co.Nov 1995 → Dec 1998
- 3Spur Operating Co.Jan 1999 → Oct 2012
- 4Jenex Petroleum CorporationJan 2013 → Sep 2015
- 5Maverick Energy Group, Inc.Nov 2019 → Jun 2022
- 6Silver Rock Energy, LLCJun 2024 → Feb 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 524872-99 | Recompletion | Spur Operating Co. | Oct 22, 2002 | Oct 24, 2002 | — | 3,391 |
| 479792-99 | Recompletion | Koven Production Co. | Sep 30, 1998 | Oct 5, 1998 | — | 3,391 |
| 443832-99 | Recompletion | Koven Production Co. | Jan 18, 1996 | Jan 25, 1996 | Jan 29, 1996 | 3,391 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-2421 | — | — | — | — |
| — | — O-1-14047 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,876 | 2,878 | Perforated |
| 2,880 | 2,884 | Perforated |
| 2,898 | 2,903 | Perforated |
| 2,904 | 2,904 | Perforated |
| 4,910 | 2,920 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 100 | 12.5 | — |
| 5.5 | 3,391 | 8.5 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 29, 1996 | Jun 14, 1996 | Yes |
| 00 | Jul 12, 1996 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-00575 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-00575 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50700575, documented in the API reference.