WELL · 42-507-31701 · DISTRICT 1

Pryor Ranch #73

Y

Zavala County · Winn-Dulce (del Monte-Oil) field · Shut IN  · Vertical

Pryor Ranch #73 (API 42-507-31701) is a well in Zavala County operated by Mcday Energy Corp., completed November 20, 1987 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued May 26, 1982, permitted to 3,255 ft.

It was permitted by Winn Exploration/Dulce Company and has since transferred to Mcday Energy Corp. on the wellbore schedule.

Completion filings report 5 formation tops, including Escondido, Olmos, Del Monte, Bracero.

Its lease has reported 51.2K barrels of oil and 1.78K mcf of gas since January 1993, last reporting in July 2026. The lease carries 17 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

McDay Energy Corp.

Permitted by Winn Exploration/Dulce Company; the EWA schedule now lists a different operator.

Plano, TX · P-5 Y, filed Apr 4, 2026 · 52 permits on file · (214) 202-1064

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcDay Energy Corp.
Production reportsMcDay Energy Corp.through Sep 2022
Latest permitWinn Exploration/Dulce CompanyMay 26, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,255
total depth, ft
1
permits on file
May 26, 1982
last permit issued
Nov 20, 1987
completed
51.2K
cumulative oil, bbl
1.78K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 20, 1987
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pryor Ranch O-1-8655Winn-Dulce (del Monte-Oil)McDay Energy Corp.1751.2K1.78KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winn Exploration Co., Inc.Jan 1993 → Oct 1994
  2. 2McDay Energy Corp.Nov 1994 → Sep 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
161918-99DrillWinn Exploration/Dulce CompanyMay 26, 1982May 26, 1982Oct 26, 19823,255

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-8655————

Formation tops

As filed on W-2/G-1. Subsea from 655 ft elevation.Download CSV →

FormationMD ftSubsea
Escondido1,883-1,228
Olmos2,510-1,855
Del Monte2,940-2,285
Bracero3,014-2,359
Elaine3,112-2,457

Perforations

Perforated and open-hole intervals.

FromToType
2,9482,956Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520112.25145 S
2.3752,927——
4.53,2177.875725 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 28, 1988Apr 11, 1988—
00Jan 12, 1984Jun 6, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
113K
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064205H-1 InjectionActive1501,0002,948–2,956

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50731701, documented in the API reference.