WELL · 42-507-31902 · DISTRICT 1

Brice, Mary M. "B" #4

Plugged

Zavala County  · Vertical

Brice, Mary M. "B" #4 (API 42-507-31902) is a plugged well in Zavala County, plugged December 27, 1986, last operated by Jennings Exploration CO..

The RRC has issued one drilling permit, issued January 28, 1983, permitted to 4,900 ft.

Operator of record

Jennings Exploration Co.

Beeville, TX · P-5 Y, filed Mar 4, 2026 · 133 permits on file · (361) 362-3529

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitJennings Exploration Co.Jan 28, 1983
4,900
total depth, ft
1
permits on file
Jan 28, 1983
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 27, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
184844-99DrillJennings Exploration Co.Jan 28, 1983Jan 28, 1983—4,900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

8.32K
bbl, last 12 reported months
8.32K
bbl, all reported
Dec 1984
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052294H-1 InjectionPlugged Jan 7, 19871001,5004,494–4,520

MONTHLY INJECTED, BBL · H-10 · LAST 3 REPORTED MONTHS

Last 12 months 8,317

02K4K6K

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50731902, documented in the API reference.