WELL · 42-507-32006 · DISTRICT 1

Norton R.W. #101

Plugged

Zavala County · Bandera Tank West (2500) field  · Vertical

Norton R.W. #101 (API 42-507-32006) is a plugged well in Zavala County, plugged December 28, 2016, last operated by Williamson Operating CO..

The RRC has issued one drilling permit, issued October 26, 1983, permitted to 2,500 ft.

It was permitted by Weeks Exploration Company and has since transferred to Williamson Operating CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Olmos, San Miguel, Serpentine.

Its lease has reported 130 barrels of oil and 7 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Williamson Operating Co.

Permitted by Weeks Exploration Company; the EWA schedule now lists a different operator.

Uvalde, TX · P-5 Y, filed Aug 4, 2025 · 4 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilliamson Operating Co.
Production reportsWilliamson Operating Co.through Sep 1993
Latest permitWeeks Exploration CompanyOct 26, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,500
total depth, ft
1
permits on file
Oct 26, 1983
last permit issued
Dec 7, 1983
completed
130
cumulative oil, bbl
7
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 7, 1983
Shut in
—
Plugged
Dec 28, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Norton, R.W. O-1-9958Bandera Tank, West (2500)Williamson Operating Co.11307Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williamson Operating Co.Jan 1993 → Sep 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
218858-99DrillWeeks Exploration CompanyOct 26, 1983Oct 26, 1983Nov 23, 19832,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-9958————

Formation tops

As filed on W-2/G-1. Subsea from 617 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos1,794-1,177
San Miguel2,314-1,697
Serpentine2,520-1,903

Perforations

Perforated and open-hole intervals.

FromToType
2,5262,528Perforated
2,5442,547Perforated
2,5602,562Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564512.25420 S
4.52,8147.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 1, 1984Aug 2, 1984—
00Oct 17, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732006, documented in the API reference.