WELL · 42-507-32257 · DISTRICT 1

Heitz B.M. #1

Plugged

Zavala County · Pearsall (Austin Chalk) field  · Horizontal

Heitz B.M. #1 (API 42-507-32257) is a plugged horizontal well in Zavala County, plugged March 20, 1996, last operated by Flint Oak Energy LLC.

The RRC has issued 2 drilling permits between 1989 and 1999, permitted to 9,200 ft.

It was permitted by Double J Operating Company, Inc. and has since transferred to Flint Oak Energy LLC on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its 2 leases have reported 518K barrels of oil and 289K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Flint Oak Energy LLC

Permitted by Double J Operating Company, Inc.; the EWA schedule now lists a different operator.

Montgomery, TX · P-5 Y, filed Jan 4, 2026 · 14 permits on file · (832) 262-9521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFlint Oak Energy LLC
Production reportsHawthorn Energy Partners, LLCthrough Dec 2014
Latest permitDouble J Operating Company, Inc.Feb 2, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
2
permits on file
Feb 2, 1999
last permit issued
Oct 10, 1989
completed
518K
cumulative oil, bbl
289K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 10, 1989
Shut in
—
Plugged
Mar 20, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heitz, B.M. O-1-12350Pearsall (Austin Chalk)Flint Oak Energy, LLC3350K289KJan 1993 – Jul 2026
Heitz, B. M. O-1-14247Pearsall (Austin Chalk)Hawthorn Energy Partners, LLC1168K0Mar 1999 – Mar 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyJan 1993 → Mar 1999
  2. 2Double J Operating Company, Inc.Mar 1999 → Jun 2006
  3. 3Kerr-McGee CorporationApr 1999 → Sep 1999
  4. 4Kerr-McGee Oil & Gas Onshore LLCOct 1999 → Jan 2003
  5. 5Texas American Resources CompanyFeb 2003 → Aug 2009
  6. 6Hawthorn Energy Partners, LLCJul 2006 → Dec 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482287-99ReenterDouble J Operating Company, Inc.Jan 27, 1999Feb 2, 1999Feb 24, 19996,250
362675-99DrillOryx Energy CompanyAug 11, 1989Aug 11, 1989Aug 17, 19899,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12350————
—— O-1-14247————

Formation tops

As filed on W-2/G-1. Subsea from 3,195 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk6,216-3,021

Perforations

Perforated and open-hole intervals.

FromToType
6,2168,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37570017.5655 S
9.6256,21612.25350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 1999May 3, 1999—
00May 11, 1999——
00Jan 4, 1990Nov 13, 1989Yes
00Dec 11, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732257, documented in the API reference.