WELL · 42-507-32311 · DISTRICT 1

Garner John N. #12

Plugged

Zavala County · Pearsall (Austin Chalk) field  · Horizontal · Sidetrack

Garner John N. #12 (API 42-507-32311) is a plugged horizontal well in Zavala County, plugged November 7, 2002, last operated by Omni Operating Company(A).

The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 10,600 ft.

It was permitted by Oryx Energy Company and has since transferred to Omni Operating Company(A) on the wellbore schedule.

Completion filings report 5 formation tops, including San Miguel, Austin Chalk, T/Austin Chalk, Lwr Austin.

Its lease has reported 16.9K barrels of oil and 7.32K mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

Omni Operating Company(a)

Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 2025 · 24 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOmni Operating Company(a)
Production reportsOmni Operating Company(a)through Jan 1999
Latest permitOryx Energy CompanyApr 10, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
2
permits on file
Apr 10, 1991
last permit issued
May 21, 1991
completed
16.9K
cumulative oil, bbl
7.32K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 21, 1991
Shut in
—
Plugged
Nov 7, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garner, John N. O-1-5374Pearsall (Austin Chalk)Omni Operating Company(a)1116.9K7.32KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyJan 1993 → Aug 1994
  2. 2McDaniel Company, Inc., TheNov 1994 → Dec 1995
  3. 3Omni Operating Company(a)Jan 1996 → Jan 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
386625-99Recompletion · sidetrackOryx Energy CompanyApr 10, 1991Apr 10, 1991May 19, 199110,600
371729-99DrillOryx Energy CompanyApr 2, 1990Apr 2, 1990Apr 17, 19909,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-5374————

Formation tops

As filed on W-2/G-1. Subsea from 643 ft elevation.Download CSV →

FormationMD ftSubsea
San Miguel4,725-4,082
Austin Chalk6,265-5,622
T/Austin Chalk6,265-5,622
LWR Austin6,568-5,925
B/Austin Chalk6,805-6,162

Perforations

Perforated and open-hole intervals.

FromToType
6,04510,300Perforated
6,30710,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37571217.5675 S
9.6256,30712.251,855 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 15, 1991Jun 14, 1991Yes
00Dec 19, 1990Jul 23, 1990Yes
00Dec 14, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732311, documented in the API reference.