WELL · 42-507-32405 · DISTRICT 1
Garner John N. #13
Zavala County · Pearsall (Austin Chalk) field · Horizontal · Sidetrack
Garner John N. #13 (API 42-507-32405) is a plugged horizontal well in Zavala County, plugged November 14, 2002, last operated by Omni Operating Company(A).
The RRC has issued 2 drilling permits between 1991 and 1994, permitted to 10,600 ft.
It was permitted by Oryx Energy Company and has since transferred to Omni Operating Company(A) on the wellbore schedule.
Completion filings report 4 formation tops, including Midway, Anacacho, Lower Chalk, Top Lower Chalk.
Its lease has reported 16.9K barrels of oil and 7.32K mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Dec 4, 2025 · 24 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Omni Operating Company(a) |
| Production reports | Omni Operating Company(a)through Jan 1999 |
| Latest permit | Oryx Energy CompanyMay 13, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,600
- total depth, ft
- 2
- permits on file
- May 13, 1994
- last permit issued
- Jun 14, 1994
- completed
- 16.9K
- cumulative oil, bbl
- 7.32K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 1994
- Shut in
- —
- Plugged
- Nov 14, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garner, John N. O-1-5374 | Pearsall (Austin Chalk) | Omni Operating Company(a) | 11 | 16.9K | 7.32K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oryx Energy CompanyJan 1993 → Aug 1994
- 2McDaniel Company, Inc., TheNov 1994 → Dec 1995
- 3Omni Operating Company(a)Jan 1996 → Jan 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 423931-99 | Recompletion · sidetrack | Oryx Energy Company | May 13, 1994 | May 13, 1994 | May 1, 1994 | 7,000 |
| 385871-99 | Drill | Oryx Energy Company | Mar 19, 1991 | Mar 18, 1991 | Mar 25, 1991 | 10,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-5374 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 621 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,010 | 10,352 | Perforated |
| 6,010 | 10,433 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 733 | 17.5 | 575 S |
| 9.625 | 6,010 | 9.625 | 525 S |
| 9.625 | 6,010 | 12.25 | 1,390 S |
| 13.375 | 7,433 | 17.5 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 5, 1994 | Jul 11, 1994 | Yes |
| 00 | Sep 26, 1991 | Aug 29, 1991 | Yes |
| 00 | Sep 25, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-32405 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-32405 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50732405, documented in the API reference.