WELL · 42-507-32469 · DISTRICT 1

Chittim #1

Y

Zavala County · Chonan (S.M.D.) field · Temp Abandoned  · Vertical

Chittim #1 (API 42-507-32469) is a well in Zavala County operated by Conway Energy Oper Services Inc., completed April 22, 1993 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 22, 1993, permitted to 2,700 ft.

It was permitted by Genesis Producing Company and has since transferred to Conway Energy Oper Services Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Esc, Olm, San Miguel.

No lease production has been reported under this well’s leases.

Operator of record

Conway Energy Oper Services Inc.

Permitted by Genesis Producing Company; the EWA schedule now lists a different operator.

San Diego, TX · P-5 Y, filed May 4, 2026 · (361) 759-3130

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConway Energy Oper Services Inc.
Production reportsConway Energy Oper Services Inc.through Aug 2024
Latest permitGenesis Producing CompanyFeb 22, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,700
total depth, ft
2
permits on file
Feb 22, 1993
last permit issued
Apr 22, 1993
completed
0
cumulative oil, bbl
1.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 22, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chittim G-1-145261Chonan (S.M.D.)Conway Energy Oper Services Inc.101.97MApr 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,361(-100%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Genesis Producing CompanyApr 1993 → Nov 1993
  2. 2Swift Energy CompanyDec 1993 → May 1999
  3. 3Western Gulf Oil & Gas Inc.Jun 1999 → Mar 2000
  4. 4Brown, C. Douglas, LLCApr 2000 → Nov 2005
  5. 5BXP Operating, LLCDec 2005 → Oct 2011
  6. 6Patterson Energy CorporationNov 2011 → Feb 2019
  7. 7National Surface & Minerals, LLCMar 2019 → May 2020
  8. 8Conway Energy Oper Services Inc.Jun 2020 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
409022-98DrillGenesis Producing CompanyMay 20, 1993Feb 22, 1993—2,700
409022-99DrillGenesis Producing CompanyFeb 16, 1993Feb 22, 1993Mar 19, 19932,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-145261————

Formation tops

As filed on W-2/G-1. Subsea from 653 ft elevation.Download CSV →

FormationMD ftSubsea
Esc900-247
Olm1,535-882
San Miguel2,000-1,347

Perforations

Perforated and open-hole intervals.

FromToType
2682,320Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545812.25210 S
4.525,9057.875480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 3, 1993May 20, 1993Yes
00May 28, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732469, documented in the API reference.