WELL · 42-507-32507 · DISTRICT 1

Holdsworth #1

Plugged

Zavala County · Indio (Olmos) field  · Vertical

Holdsworth #1 (API 42-507-32507) is a plugged well in Zavala County, plugged August 7, 2001, last operated by Prime Operating Company.

The RRC has issued one drilling permit, issued July 14, 1995, permitted to 3,800 ft.

It was permitted by Arrowhead Enterprises, Inc. and has since transferred to Prime Operating Company on the wellbore schedule.

Completion filings report one formation top, including Olmos.

Operator of record

Prime Operating Company

Permitted by Arrowhead Enterprises, Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Oct 4, 2025 · 595 permits on file · (800) 310-3434

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrime Operating Company
Production reportsPrime Operating Companythrough Jul 2000
Latest permitArrowhead Enterprises, Inc.Jul 14, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,800
total depth, ft
1
permits on file
Jul 14, 1995
last permit issued
Sep 7, 1995
completed
0
cumulative oil, bbl
654K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Oct 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 7, 1995
Shut in
—
Plugged
Aug 7, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holdsworth G-1-156079Indio (Olmos)Prime Operating Company10654KSep 1995 – Oct 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrowhead Enterprises, Inc.Sep 1995 → Jun 1996
  2. 2Prime Operating CompanyJul 1996 → Jul 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431017-99DrillArrowhead Enterprises, Inc.Jan 5, 1995Jul 14, 1995Jul 22, 19953,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-156079————

Formation tops

As filed on W-2/G-1. Subsea from 651 ft elevation.Download CSV →

FormationMD ftSubsea
Olmos3,538-2,887

Perforations

Perforated and open-hole intervals.

FromToType
3,5383,540Perforated
3,5523,556Perforated
3,5653,570Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540912.25165 S
4.53,8007.875615 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 17, 1999Apr 30, 1999—
00Jan 5, 1996Oct 27, 1995Yes
00Dec 4, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732507, documented in the API reference.