WELL · 42-507-32726 · DISTRICT 1
Tlapek #1RE
Zavala County · Pearsall (Austin Chalk) field · Producing · Horizontal
Tlapek #1RE (API 42-507-32726) is a horizontal well in Zavala County operated by Cml Exploration LLC, completed June 27, 2008 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2008 and 2026, permitted to 7,100 ft.
Completion filings report 5 formation tops, including Escondido, Olmos, Elaine Sand, Anacacho.
Its lease has reported 66.3K barrels of oil since June 2008, last reporting in July 2026.
Operator of record
Austin, TX · P-5 Y, filed Jul 4, 2026 · 514 permits on file · (800) 460-6313
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CML Exploration LLC |
| Production reports | CML Exploration, LLCthrough Apr 2026 |
| Latest permit | CML Exploration, LLCJul 10, 2026 |
- 7,100
- total depth, ft
- 2
- permits on file
- Jul 10, 2026
- last permit issued
- Jun 27, 2008
- completed
- 66.3K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 27, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tlapek O-1-14956 | Pearsall (Austin Chalk) | CML Exploration, LLC | 1 | 66.3K | 0 | Jun 2008 – Jul 2026 |
Oil, barrels lease total
Last 12 months 929 · prior 12 1,035(-10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CML Exploration, LLCJun 2008 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 916476-99 | Recompletion | CML Exploration, LLC | Jun 16, 2026 | Jul 10, 2026 | — | 6,100 |
| 661255-99 | Drill | CML Exploration, LLC | May 5, 2008 | May 19, 2008 | May 20, 2008 | 7,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14956 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 641 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| EscondidoESCONDIDO - DISPOSAL | 2,374 | -1,733 |
| OlmosOLMOS SAND | 3,279 | -2,638 |
| Elaine Sand | 4,244 | -3,603 |
| Anacacho | 4,726 | -4,085 |
| Austin Chalk | 5,217 | -4,576 |
| Austin Chalk | 5,249 | -4,608 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,952 | 11,121 | Open hole |
| 4,952 | 15,719 | Open hole |
| 4,952 | 16,110 | Open hole |
| 4,952 | 16,183 | Open hole |
| 5,170 | 8,458 | Open hole |
| 5,300 | 7,602 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,111 | 12.25 | 877 S |
| 7 | 5,170 | 8.75 | 642 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 19, 2026 | Sep 24, 2026 | Yes |
| 00 | Nov 19, 2008 | Jul 21, 2008 | Yes |
| 00 | Nov 1, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-32726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-32726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50732726, documented in the API reference.