WELL · 42-507-32743 · DISTRICT 1
Chicon Creek #2
Zavala County · Comanche-Halsell (6500) field · Horizontal · Directional
Chicon Creek #2 (API 42-507-32743) is a plugged horizontal well in Zavala County, plugged August 16, 2023, last operated by Rio-Tex Inc..
The RRC has issued one drilling permit (amended once), issued August 13, 2009, permitted to 8,000 ft.
Completion filings report 5 formation tops, including Eagle Ford, Buda, Georgetown, Edward.
Its lease has reported 56.3K barrels of oil since December 2007, last reporting in October 2023. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
San Antonio, TX · P-5 Y, filed Jul 4, 2026 · 178 permits on file · (210) 497-1113
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rio-Tex Inc. |
| Production reports | Rio-Tex, Inc.through Apr 2016 |
| Latest permit | Rio-Tex, Inc.Aug 13, 2009 |
- 8,000
- total depth, ft
- 2
- permits on file
- Aug 13, 2009
- last permit issued
- Oct 16, 2009
- completed
- 56.3K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2007 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 2009
- Shut in
- —
- Plugged
- Aug 16, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chicon Creek O-1-14898 | Comanche-Halsell (6500) | Rio-Tex, Inc. | 2 | 56.3K | 0 | Dec 2007 – Oct 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Txco Resources Inc.Dec 2007 → Jan 2008
- 2Rio-Tex, Inc.Feb 2008 → Apr 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 683894-98 | Drill | Rio-Tex, Inc. | Sep 23, 2009 | Aug 13, 2009 | Aug 23, 2009 | 8,000 |
| 683894-99 | Drill | Rio-Tex, Inc. | Aug 6, 2009 | Aug 13, 2009 | Aug 23, 2009 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14898 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 571 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Eagle FordEAGLEFORD | 5,125 | -4,554 |
| Buda | 5,660 | -5,089 |
| Georgetown | 6,065 | -5,494 |
| Edward | 7,030 | -6,459 |
| Glen RoseGLENROSE | 7,330 | -6,759 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,520 | 7,923 | Perforated |
| 7,551 | 8,002 | Perforated |
| 7,558 | 7,892 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 804 | 12.25 | 220 S |
| 5.5 | 7,405 | 7.875 | 950 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2010 | Nov 2, 2009 | Yes |
| 00 | Jan 20, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-32743 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-32743 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50732743, documented in the API reference.