WELL · 42-603-30265 · DISTRICT 4
State Tract 806-S #1
Matgrda IS-SB County · Matagorda 806 (Frio 11100) field · Directional
State Tract 806-S #1 (API 42-603-30265) is a plugged well in Matgrda IS-SB County, plugged August 7, 2011, last operated by Walter Oil & Gas Corporation.
The RRC has issued 2 drilling permits (amended once) between 2003 and 2005, permitted to 12,500 ft.
Completion filings report one formation top, including Frio.
Operator of record
Houston, TX · P-5 Y, filed Jun 4, 2026 · 193 permits on file · (713) 659-1221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walter Oil & Gas Corporation |
| Production reports | Walter Oil & Gas Corporationthrough Jul 2011 |
| Latest permit | Walter Oil & Gas CorporationSep 19, 2005 |
- 12,500
- total depth, ft
- 3
- permits on file
- Sep 19, 2005
- last permit issued
- Nov 3, 2005
- completed
- 0
- cumulative oil, bbl
- 2.85M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Nov 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 2005
- Shut in
- —
- Plugged
- Aug 7, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 806-S G-4-201698 | Wildcat | Walter Oil & Gas Corporation | 1 | 0 | 2.85M | Aug 2003 – Nov 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walter Oil & Gas CorporationSep 2004 → Jul 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 606497-99 | Recompletion | Walter Oil & Gas Corporation | Sep 16, 2005 | Sep 19, 2005 | Sep 26, 2005 | 11,500 |
| 530624-98 | Drill | Gryphon Exploration Company | Jun 23, 2003 | Apr 22, 2003 | May 21, 2003 | 12,500 |
| 530624-99 | Drill | Gryphon Exploration Company | Apr 11, 2003 | Apr 22, 2003 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-201698 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 96 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 9,500 | -9,404 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,178 | 11,316 | Perforated |
| 11,192 | 11,244 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 18.625 | 1,000 | 20 | 1,455 S |
| 13.75 | 3,498 | 17.5 | 2,259 S |
| 13.375 | 3,498 | 17.5 | 2,259 S |
| 9.625 | 7,795 | 12.25 | 1,998 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 20, 2006 | Jan 31, 2006 | — |
| 00 | Feb 22, 2005 | Oct 27, 2004 | — |
| 00 | Aug 4, 2004 | Feb 19, 2004 | Yes |
| 00 | Jun 24, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-603-30265 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-603-30265 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.