WELL · 42-703-30124 · DISTRICT 2
State Tract 596-L NE/4 #3
Matgrda IS-LB County · Sherman Offshore SW. (3950) field · Vertical
State Tract 596-L NE/4 #3 (API 42-703-30124) is a well in Matgrda IS-LB County operated by Gulf Energy Exploration Corp., completed January 5, 2009.
The RRC has issued 2 drilling permits between 1977 and 2008, permitted to 5,500 ft.
No lease production has been reported under this well’s leases.
Operator of record
Austin, TX · P-5 Y, filed Mar 4, 2026 · 4 permits on file · (512) 466-2290
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Gulf Energy Exploration Corp. |
| Production reports | Gulf Energy Exploration Corp.through Jun 2013 |
| Latest permit | Gulf Energy Exploration Corp.Dec 29, 2008 |
- 5,500
- total depth, ft
- 2
- permits on file
- Dec 29, 2008
- last permit issued
- Jan 5, 2009
- completed
- 0
- cumulative oil, bbl
- 290K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 5, 2009
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 596-L NE/4 G-2-255449 | Sherman Offshore (1700) | Gulf Energy Exploration Corp. | 1 | 0 | 268K | Oct 2009 – Jul 2026 |
| State Tract 596-L, NE/4 G-2-79076 | Sherman Offshore, SW. (3020) | Gulf Energy Exploration Corp. | 1 | 0 | 9.66K | Jan 1993 – Oct 2009 |
| State Tract 596-L NE/4 G-2-79121 | Sherman Offshore, SW. (3950) | Gulf Energy Exploration Corp. | 1 | 0 | 11.8K | Jan 1993 – Oct 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pg&e Resources Offshore CompanyJan 1993 → Jun 1993
- 2Gulf Energy Exploration Corp.Mar 2009 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 676520-99 | Recompletion | Gulf Energy Exploration Corp. | Dec 17, 2008 | Dec 29, 2008 | Sep 26, 2009 | 1,850 |
| 8119-99 | Drill | Corpus Christi Oil & Gas Co. | Sep 21, 1977 | Sep 21, 1977 | Oct 8, 1977 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-79076 | — | — | — | — |
| — | — G-2-79121 | — | — | — | — |
| — | — G-2-255449 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,730 | 1,736 | Perforated |
| 3,017 | 3,022 | Perforated |
| 3,943 | 3,948 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 30 | 237 | — | — |
| 13.375 | 487 | 16 | 900 S |
| 9.625 | 1,400 | 12.25 | 900 S |
| 2.375 | 2,982 | — | — |
| 2.375 | 3,883 | — | — |
| 7 | 4,954 | 8.375 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 2010 | Mar 8, 2010 | Yes |
| 00 | Apr 29, 2010 | — | — |
| 00 | Aug 28, 2009 | Feb 20, 2009 | — |
| 00 | Jan 12, 1984 | Jul 20, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-703-30124 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-703-30124 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/70330124, documented in the API reference.