WELL · 42-703-30217 · DISTRICT 2
State Tract 629-L, SW/4 #1
Matgrda IS-LB County · Matagorda Block 629 (4450 SD) field · Vertical
State Tract 629-L, SW/4 #1 (API 42-703-30217) is a well in Matgrda IS-LB County operated by Kirby Exploration Company, completed January 31, 1981.
The RRC has issued one drilling permit, issued July 15, 1980, permitted to 7,386 ft.
Its 2 leases have reported 1.4M barrels of oil and 255K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Mar 4, 1992 · 73 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kirby Exploration Company |
| Production reports | White Marlin Operating Co, LLCthrough Dec 2024 |
| Latest permit | Kirby Exploration CompanyJul 15, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,386
- total depth, ft
- 1
- permits on file
- Jul 15, 1980
- last permit issued
- Jan 31, 1981
- completed
- 1.4M
- cumulative oil, bbl
- 255K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 31, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 629-L SW/4 G-2-92197 | Matagorda Block 629 (4300) | White Marlin Operating Co, LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
| State Lease 629-L SW/4 O-2-6488 | Matagorda Block 629 (4450 SD) | White Marlin Operating Co, LLC | 3 | 1.4M | 255K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 99(-100%)
Gas, mcf lease total
Last 12 months 0 · prior 12 85(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1American Exploration CompanyJan 1993 → Dec 1996
- 2Sabco Operating CompanyJan 1997 → Oct 2011
- 3Sabco Operating Company, LLCNov 2011 → Jan 2014
- 4White Marlin Operating Co, LLCFeb 2014 → Dec 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 86752-99 | Drill | Kirby Exploration Company | Jul 15, 1980 | Jul 15, 1980 | Dec 17, 1980 | 7,386 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-92197 | — | — | — | — |
| — | — O-2-6488 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,304 | 4,331 | Perforated |
| 4,454 | 4,463 | Perforated |
| — | 4,463 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 30 | 197 | — | — |
| 16.5 | 812 | 22 | 1,050 S |
| 10.75 | 3,994 | 13.75 | 1,500 S |
| 2.375 | 4,279 | — | — |
| 2.375 | 4,408 | — | — |
| 7 | 6,493 | 9.875 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Mar 6, 1981 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-703-30217 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-703-30217 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/70330217, documented in the API reference.