WELL · 42-703-30241 · DISTRICT 2

State Tract 659-L NW/4 #1

Y

Matgrda IS-LB County · Matagorda Block 629 (4450 SD) field · Shut IN  · Vertical

State Tract 659-L NW/4 #1 (API 42-703-30241) is a well in Matgrda IS-LB County operated by White Marlin Operating CO LLC, completed August 14, 1981 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued March 26, 1981, permitted to 7,000 ft.

It was permitted by Kirby Exploration Company and has since transferred to White Marlin Operating CO LLC on the wellbore schedule.

Completion filings report one formation top, including Massive Sand.

Its lease has reported 1.76M barrels of oil and 204K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

White Marlin Operating Co LLC

Permitted by Kirby Exploration Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 32 permits on file · (713) 935-2325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhite Marlin Operating Co LLC
Production reportsWhite Marlin Operating Co, LLCthrough Sep 2025
Latest permitKirby Exploration CompanyMar 26, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Mar 26, 1981
last permit issued
Aug 14, 1981
completed
1.76M
cumulative oil, bbl
204K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 14, 1981
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State Tract 659-L NW/4 O-2-6468Matagorda Block 629 (4450 SD)White Marlin Operating Co, LLC31.76M204KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 236(-100%)

0100200202420252026

Oil, barrels lease total

Last 12 months 40 · prior 12 66(-39%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Exploration CompanyJan 1993 → Dec 1996
  2. 2Sabco Operating CompanyJan 1997 → Oct 2011
  3. 3Sabco Operating Company, LLCNov 2011 → Jan 2014
  4. 4White Marlin Operating Co, LLCFeb 2014 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
113316-99DrillKirby Exploration CompanyMar 26, 1981Mar 26, 1981May 27, 19817,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6468————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Massive Sand5,020

Perforations

Perforated and open-hole intervals.

FromToType
5,0225,032Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
16822221,300 S
10.752,11313.751,500 S
2.3754,912——
77,0009.8751,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 1985Oct 16, 1981—
00Jan 12, 1984Feb 2, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/70330241, documented in the API reference.