FIELDS · TEXAS · FIELD 19476690
Coleen (Strawn)
Field · District 7B · Parker County · Strawn in every state →
Coleen (Strawn) is an RRC field with 8 leases on file reported by 6 operators, in Parker County.
No volume has been reported since February 2011.
Fossil Operating, Inc. holds the most, 3 leases and 68,264 mcf of gas lifetime.
Lifetime, the field has reported 0 barrels of oil and 233,664 mcf of gas.
- 8
- leases on file
- 0
- leases reporting volume
- 6
- operators, all time
- 0
- active wellbores of 8 · 0 operators today
- 0
- bbl oil, 12 months through Apr 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl oil, lifetime · 233,664 Mcf gas
Every well completed in it, searchable →
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 4
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Fossil Operating, Inc. | 3 | 0 | 68.3K | Dec 2000 |
| Smith Pipe of Abilene | 3 | 0 | 150K | May 2005 |
| Plover Production Company | 1 | 0 | 6.94K | Feb 2003 |
| Vargas Energy, Ltd. | 1 | 0 | 8.82K | Feb 2011 |
Counties
- Parker County → 8 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Bergman #1 | Fossil Operating Inc. | Parker | Apr 20, 1998 | — | 0 | 0 |
| Bozzell #1 | Smith Pipe of Abilene | Parker | Apr 2, 1998 | — | 0 | 0 |
| Newberry #2 | Smith Pipe of Abilene | Parker | Jan 22, 1998 | — | 0 | 0 |
| Whitehouse #1 | Fossil Operating Inc. | Parker | Jun 4, 1997 | — | 0 | 0 |
| Newberry #1 | Smith Pipe of Abilene | Parker | May 29, 1997 | — | 0 | 0 |
| Wiese #1 | Fossil Operating Inc. | Parker | Jan 13, 1997 | — | 0 | 0 |
| Doss #2 | Plover Production Company | Parker | Oct 15, 1984 | — | 0 | 0 |
| Jones-Edwards #6 | Vargas Energy Ltd. | Parker | Sep 1, 1979 | — | 0 | 0 |
About this data
Field 19476690 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Apr 2026. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Strawn, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/19476690, documented in the API reference.