FIELDS · TEXAS · FIELD 57299757
Maple Slough (Upper Wilcox Cons)
Field · District 03 · Hardin County · Upper Wilcox Cons in every state →
Maple Slough (Upper Wilcox Cons) is an RRC field with 10 leases on file reported by 9 operators, in Hardin County.
No volume has been reported since August 2022.
Magnum Producing, LP holds the most, 5 leases and 22,500 barrels of oil lifetime.
Lifetime, the field has reported 29,816 barrels of oil and 117,666 mcf of gas, across 4 oil and 6 gas leases.
- 10
- leases on file · 4 oil, 6 gas
- 0
- leases reporting volume
- 9
- operators, all time
- 1
- active wellbores of 9 · 1 operators today
- 0
- bbl oil, 12 months through Apr 2026
- 0
- Mcf gas, same 12 months
- 29,816
- bbl oil, lifetime · 117,666 Mcf gas
Every well completed in it, searchable →
Reported production by month
12 months through Apr 2026 0 · prior 12 0
Maple Slough (Upper Wilcox Cons): Oil by month.
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 5
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Magnum Producing, LP | 5 | 22.5K | 118K | Oct 2017 |
| Wallis Energy, Inc. | 1 | 6.15K | 0 | Aug 2022 |
| Primrose Resources, LLC | 2 | 1.17K | 0 | Nov 2014 |
| BP America Production Company | 1 | 0 | 0 | — |
| Brammer Engineering, Inc. | 1 | 0 | 0 | — |
All 10 leases in Maple Slough (Upper Wilcox Cons), searchable →
Counties
- Hardin County → 10 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Ticonderoga Gas Unit a #2 | Magnum Producing LP | Hardin | Jul 19, 2024 | — | — | — |
| Ticonderoga Gas Unit C #1H | BP America Production Company | Hardin | Nov 20, 2015 | — | — | — |
| Ticonderoga D #1 | Magnum Producing LP | Hardin | Oct 29, 2015 | — | — | — |
| Ticonderoga a #1 | Magnum Producing LP | Hardin | Oct 11, 2015 | — | — | — |
| Ticonderoga B #1O | Magnum Producing LP | Hardin | Jul 24, 2015 | — | — | — |
| BP Ricker #1 | Brammer Engineering Inc. | Hardin | Aug 28, 2010 | — | — | — |
| Tanton #1 | Wallis Energy Inc. | Hardin | Oct 12, 1997 | — | — | — |
| Arco Fee #2 | Primrose Resources LLC | Hardin | Aug 17, 1986 | — | — | — |
| D J Unit a #1 | Primrose Resources LLC | Hardin | Jun 1, 1985 | — | — | — |
About this data
Field 57299757 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Apr 2026. Oil includes condensate from gas leases and gas includes casinghead gas from oil leases, as the RRC totals them. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Upper Wilcox Cons, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/57299757, documented in the API reference.