LEASES · G-1-187461 · GAS · DISTRICT 01

Kincaid

Reporting

Dawson Energy, LLC · Val Verde County · Will O, North (Wolfcamp) field

Kincaid is an RRC gas lease (G-1-187461) in Val Verde County operated by Dawson Energy, LLC, with one well completed on it.

It has reported 26.3K mcf of gas since March 2000, last reporting volume in April 2026 (statewide data runs through April 2026).

The last 12 reported months total 61 mcf of gas.

4 operators have filed production on it, most recently Dawson Energy, LLC since December 2025.

26.3K
mcf gas, all reported
0
bbl condensate and oil
61
mcf gas, last 12 reported
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST MAR 2000 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 61 · prior 12 186(-67%)

01002002017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps hyperbolic curve fitted to the 26 reporting months of gas since the peak in Nov 2023. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

96%
first-year decline from the peak (nominal Di 615%)
0.4
b factor (hyperbolic)
0.90
fit R²
10
mcf remaining on the curve, to 1 per month

Gas, mcf reported months since the peak, with the fitted curve and its projection

Last 12 months 61 · prior 12 186(-67%)

010020030020242025202620272028

Fitted hyperbolic curve from the Nov 2023 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, mcf per month1110

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Enexco, Inc.Mar 2000 → Feb 2003 · 36 mo
  2. Llano Production CompanyMar 2003 → Dec 2014 · 142 mo
  3. Wolfcamp Energy, LLCJan 2015 → Nov 2025 · 131 mo
  4. Dawson Energy, LLCDec 2025 → Jul 2026 · 8 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Producing
1

Operates them now

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-1-187461, documented in the API reference.