LEASES · G-10-59442 · GAS · DISTRICT 08
Sidlo
No volume since Dec 1994G P II Energy, Inc. · Dameron (Clear Fork) field
Sidlo is an RRC gas lease (G-10-59442) in the Dameron (Clear Fork) field operated by G P II Energy, Inc., with one well completed on it.
It has reported 1.57K mcf of gas since January 1993, last reporting volume in December 1994 (statewide data runs through April 2026).
No volume was reported in the last 12 months; the last was in December 1994.
- 1.57K
- mcf gas, all reported
- 0
- bbl condensate and oil
- 0
- mcf gas, last 12 reported
- —
- vs the 12 before
- 1
- wells completed on it
- —
- peak month, bbl
PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME DEC 1994 · STATEWIDE DATA THROUGH APR 2026
Gas by month
Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.
Last 12 months 0 · prior 12 18(-100%)
Who reported it
Each run of months one operator filed the production report, oldest first.
- G P II Energy, Inc.Jan 1993 → Sep 1996 · 45 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/g-10-59442, documented in the API reference.