LEASES · G-3-279196 · GAS · DISTRICT 03
Miller-Palt Unit
No volume since Apr 2017Ricochet Energy, Inc. · Wharton County · Phase Four (9050 Yegua) field
Miller-Palt Unit is an RRC gas lease (G-3-279196) in Wharton County operated by Ricochet Energy, Inc., with one well completed on it.
It has reported 165K mcf of gas since October 2014, last reporting volume in April 2017 (statewide data runs through April 2026).
No volume was reported in the last 12 months; the last was in April 2017.
- 165K
- mcf gas, all reported
- 0
- bbl condensate and oil
- 0
- mcf gas, last 12 reported
- —
- vs the 12 before
- 1
- wells completed on it
- —
- peak month, bbl
PDQ LEASE REPORTS · FIRST OCT 2014 · LAST VOLUME APR 2017 · STATEWIDE DATA THROUGH APR 2026
Gas by month
Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.
Last 12 months 0 · prior 12 0
Who reported it
Each run of months one operator filed the production report, oldest first.
- Ricochet Energy, Inc.Oct 2014 → Jul 2019 · 58 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/g-3-279196, documented in the API reference.