LEASES · G-3-293429 · GAS · DISTRICT 03

Eastham State Prison Farm

No volume since Jul 2024

Trailblazer Energy Resources,llc · Houston County · BSR (Sub-Clarksville) field

Eastham State Prison Farm is an RRC gas lease (G-3-293429) in Houston County operated by Trailblazer Energy Resources,LLC, with one well completed on it.

It has reported 91.9K mcf of gas since April 2022, last reporting volume in July 2024 (statewide data runs through April 2026).

No volume was reported in the last 12 months; the last was in July 2024.

2 operators have filed production on it, most recently Trailblazer Energy Resources,LLC since August 2022.

91.9K
mcf gas, all reported
0
bbl condensate and oil
0
mcf gas, last 12 reported
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST APR 2022 · LAST VOLUME JUL 2024 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 0 · prior 12 812(-100%)

05K10K2023202420252026

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Etx Energy, LLCApr 2022 → Jul 2022 · 4 mo
  2. Trailblazer Energy Resources,llcAug 2022 → Jul 2026 · 48 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Temp Abandoned
1

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-3-293429, documented in the API reference.