LEASES · G-4-117857 · GAS · DISTRICT 04

Munoz

Reporting

Kaiser-Francis Oil Company · Zapata County · El Huerfano (10800), Haynes (Middle Wilcox Cons.) field

Munoz is an RRC gas lease (G-4-117857) in Zapata County operated by Kaiser-Francis Oil Company, with one well completed on it.

It has reported 2.34M mcf of gas since January 1993, last reporting volume in April 2026 (statewide data runs through April 2026).

The last 12 reported months total 5.77K mcf of gas.

3 operators have filed production on it, most recently Kaiser-Francis Oil Company since December 2000.

2.34M
mcf gas, all reported
0
bbl condensate and oil
5.77K
mcf gas, last 12 reported
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 5,765 · prior 12 6,831(-16%)

05001K2017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps exponential curve fitted to the 120 reporting months of gas since the peak in May 2016. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

6%
first-year decline from the peak (nominal Di 6%)
0.0
b factor (exponential)
0.84
fit R²
94.7K
mcf remaining on the curve, to 1 per month

Gas, mcf reported months since the peak, with the fitted curve and its projection

Last 12 months 5,765 · prior 12 6,831(-16%)

05001K201720182019202020212022202320242025202620272028

Fitted exponential curve from the May 2016 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, mcf per month478464450437

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Transamerican Natural Gas Corp.Jan 1993 → Jan 1995 · 25 mo
  2. Transtexas Gas CorporationFeb 1995 → Nov 2000 · 70 mo
  3. Kaiser-Francis Oil CompanyDec 2000 → Jul 2026 · 308 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Producing
1

Operates them now

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-4-117857, documented in the API reference.