LEASES · G-4-69483 · GAS · DISTRICT 04

Hereford, L. M.

Reporting

Merit Energy Company · Webb County · Laredo (Lobo) field

Hereford, L. M. is an RRC gas lease (G-4-69483) in Webb County operated by Merit Energy Company, with one well completed on it.

It has reported 1.55M mcf of gas and 5.17K barrels of condensate since January 1993, last reporting volume in April 2026 (statewide data runs through April 2026).

It reported 1.79K mcf of gas in the 12 months through April 2026.

7 operators have filed production on it, most recently Merit Energy Company since May 2017.

1.55M
mcf gas, all reported
5.17K
bbl condensate, all reported
1.79K
mcf gas, 12 months through Apr 2026
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

12 months through Apr 2026 1,789 · prior 12 3,164(-43%)

01K2K3K2017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps hyperbolic curve fitted to the 81 reporting months of gas since the peak in Aug 2019. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

36%
first-year decline from the peak (nominal Di 46%)
0.1
b factor (hyperbolic)
0.75
fit R²
5.63K
mcf remaining on the curve, to 1 per month

Gas, mcf reported months since the peak, with the fitted curve and its projection

Last 12 months 1,789 · prior 12 3,164(-43%)

01K2K3K202020212022202320242025202620272028

Fitted hyperbolic curve from the Aug 2019 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, mcf per month1271079076

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Sanchez-O'Brien Oil & Gas Corp.Jan 1993 → Dec 1994 · 24 mo
  2. North Central Oil Corp.Jan 1995 → Dec 2005 · 132 mo
  3. Pogo Producing CompanyJan 2006 → Jan 2008 · 25 mo
  4. Pogo Producing Company LLCFeb 2008 → Aug 2011 · 43 mo
  5. Plains Exploration & Prod. Co.Sep 2011 → Feb 2012 · 6 mo
  6. OXY USA Inc.Mar 2012 → Apr 2017 · 62 mo
  7. Merit Energy CompanyMay 2017 → Jul 2026 · 111 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Producing
1

Operates them now

Newest permits

  • — #11—

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-4-69483, documented in the API reference.