LEASES · G-6-184392 · GAS · DISTRICT 06

Locke

Reporting

Ellora Energy Inc. · Shelby County · Duncan Cemetary (James Lime), Huxley (6100) field

Locke is an RRC gas lease (G-6-184392) in Shelby County operated by Ellora Energy Inc., with one well completed on it.

It has reported 2.71M mcf of gas since September 2000, last reporting volume in April 2026 (statewide data runs through April 2026).

The last 12 reported months total 36.1K mcf of gas.

4 operators have filed production on it, most recently Ellora Energy Inc. since August 2011.

2.71M
mcf gas, all reported
0
bbl condensate and oil
36.1K
mcf gas, last 12 reported
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST SEP 2000 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 36,078 · prior 12 39,384(-8%)

05K10K2017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps hyperbolic curve fitted to the 82 reporting months of gas since the peak in Jul 2019. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

21%
first-year decline from the peak (nominal Di 30%)
2.0
b factor (hyperbolic)
0.73
fit R²
916K
mcf remaining on the curve, to 1 per month

Gas, mcf reported months since the peak, with the fitted curve and its projection

Last 12 months 36,078 · prior 12 39,384(-8%)

05K10K202020212022202320242025202620272028

Fitted hyperbolic curve from the Jul 2019 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, mcf per month2,6952,6232,5562,494

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Phillips Petroleum CompanySep 2000 → Dec 2002 · 28 mo
  2. Conocophillips CompanyJan 2003 → Sep 2003 · 9 mo
  3. Ellora Operating, L.P.Oct 2003 → Jul 2011 · 94 mo
  4. Ellora Energy Inc.Aug 2011 → Jul 2026 · 180 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Producing
1

Operates them now

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-6-184392, documented in the API reference.