LEASES · G-6-267957 · GAS · DISTRICT 06

East Ingram GU SBN

Reporting

Rockcliff Energy Operating III · Sabine County · Carthage (Haynesville Shale) field

East Ingram GU Sbn is an RRC gas lease (G-6-267957) in Sabine County operated by Rockcliff Energy Operating Iii, with one well completed on it.

It has reported 1.94M mcf of gas since July 2012, last reporting volume in January 2026 (statewide data runs through April 2026).

It reported 13.1K mcf of gas in the 12 months through April 2026.

6 operators have filed production on it, most recently Rockcliff Energy Operating Iii since January 2026.

1.94M
mcf gas, all reported
0
bbl oil, all reported
13.1K
mcf gas, 12 months through Apr 2026
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST JUL 2012 · LAST VOLUME JAN 2026 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

12 months through Apr 2026 13,050 · prior 12 19,052(-32%)

05K10K2017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps hyperbolic curve fitted to the 114 reporting months of gas since the peak in Aug 2016. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

21%
first-year decline from the peak (nominal Di 25%)
0.4
b factor (hyperbolic)
0.85
fit R²
161K
mcf remaining on the curve, to 1 per month

Gas, mcf reported months since the peak, with the fitted curve and its projection

Last 12 months 13,050 · prior 12 19,052(-32%)

05K10K201720182019202020212022202320242025202620272028

Fitted hyperbolic curve from the Aug 2016 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, mcf per month1,1251,059998942

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Chesapeake Operating, Inc.Feb 2012 → Oct 2014 · 33 mo
  2. Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014 · 2 mo
  3. SND Operating, L.L.C.Jan 2015 → Sep 2017 · 33 mo
  4. Weatherly Oil & Gas, LLCOct 2017 → May 2019 · 20 mo
  5. Shelby Boswell Operator, LLCJun 2019 → Dec 2025 · 79 mo
  6. Rockcliff Energy Operating IIIJan 2026 → Jul 2026 · 7 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Producing
1

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-6-267957, documented in the API reference.