LEASES · G-8-224472 · GAS · DISTRICT 7B

Reese, Kayler

No volume since Aug 2010

Jilpetco, Inc. · Palo Pinto County · BCM (Strawn) field

Reese, Kayler is an RRC gas lease (G-8-224472) in Palo Pinto County operated by Jilpetco, Inc., with one well completed on it.

It has reported 5.89K mcf of gas since August 2006, last reporting volume in August 2010 (statewide data runs through April 2026).

The last 12 reported months total 753 mcf of gas.

3 operators have filed production on it, most recently Jilpetco, Inc. since July 2010.

5.89K
mcf gas, all reported
0
bbl condensate and oil
753
mcf gas, last 12 reported
—
vs the 12 before
1
wells completed on it
—
peak month, bbl

PDQ LEASE REPORTS · FIRST AUG 2006 · LAST VOLUME AUG 2010 · STATEWIDE DATA THROUGH APR 2026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 753 · prior 12 457(+65%)

05001K2007200820092010

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Jilpetco, Inc.Aug 2006 → Mar 2010 · 44 mo
  2. Hill Operating LLCApr 2010 → Jun 2010 · 3 mo
  3. Jilpetco, Inc.Jul 2010 → Aug 2010 · 2 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

1

wells completed on the lease

Not on Schedule
1

Operates them now

Newest permits

All 1 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/g-8-224472, documented in the API reference.