LEASES · O-10-20882 · OIL · DISTRICT 08

Bakke Unit

Reporting

Hilcorp Energy Company · Andrews County · Bakke (Wolfcamp) field

Bakke Unit is an RRC oil lease (O-10-20882) in Andrews County operated by Hilcorp Energy Company, with 111 wells completed on it.

It has reported 6.82M barrels of oil and 8.79M mcf of gas since January 1993, last reporting volume in April 2026 (statewide data runs through April 2026).

The last 12 reported months total 105K barrels of oil, up 118% on the year before; the lease peaked at 52.5K barrels in October 2014.

3 operators have filed production on it, most recently Hilcorp Energy Company since December 2024.

6.82M
bbl oil, all reported
8.79M
mcf gas incl. casinghead
105K
bbl oil, last 12 reported
+118%
vs the 12 before
111
wells completed on it
52.5K
peak month, bbl (Oct 2014)

PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME APR 2026 · STATEWIDE DATA THROUGH APR 2026

Oil by month

Barrels reported on Form PR for the whole lease. The latest months are revised upward as late reports arrive.

Last 12 months 105,472 · prior 12 48,299(+118%)

010K20K30K2017201820192020202120222023202420252026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

Last 12 months 159,682 · prior 12 108,863(+47%)

050K100K2017201820192020202120222023202420252026

Decline curve

A MODEL FITTED TO THE REPORTS, NOT A REPORT

An Arps exponential curve fitted to the 120 reporting months of oil since the peak in May 2016. The dashed line below is that curve, drawn over the months it was fitted to and then 24 months past the last report; where it parts from the columns is where the model stops describing the lease. It describes the trend of past reports. It does not know about recompletions, shut-ins, or new wells, and it is shown only when the lease reported within the last year and the curve explains most of the history.

17%
first-year decline from the peak (nominal Di 18%)
0.0
b factor (exponential)
0.87
fit R²
324K
bbl remaining on the curve, to 1 per month

Oil, barrels reported months since the peak, with the fitted curve and its projection

Last 12 months 105,472 · prior 12 48,299(+118%)

020K40K201720182019202020212022202320242025202620272028

Fitted exponential curve from the May 2016 peak, dashed 24 months past the last report

Projected monthOct 2026Apr 2027Oct 2027Apr 2028
On the curve, bbl per month4,4984,1063,7483,421

Quoting a projected figure as if it were reported would be wrong; the reported figures are the ones in the charts and the table view. How production is reported →

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. MW Petroleum CorporationJan 1993 → Aug 1998 · 68 mo
  2. Apache CorporationSep 1998 → Nov 2024 · 315 mo
  3. Hilcorp Energy CompanyDec 2024 → Jul 2026 · 20 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

111

wells completed on the lease

Plugged
49
Producing
27
Shut IN
27
Injection
7
Not on Schedule
1

Newest permits

All 111 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/o-10-20882, documented in the API reference.