LEASES · O-8-19650 · OIL · DISTRICT 7B
Patty "D"
No volume since Jun 2012Sojourner Drilling Corporation · Shackelford County · Lilly (Palo Pinto, Lo.) field
Patty "D" is an RRC oil lease (O-8-19650) in Shackelford County operated by Sojourner Drilling Corporation, with 5 wells completed on it.
It has reported 443 barrels of oil and 18 mcf of gas since January 1993, last reporting volume in June 2012 (statewide data runs through April 2026).
The last 12 reported months total 25 barrels of oil; the lease peaked at 47 barrels in January 1993.
- 443
- bbl oil, all reported
- 18
- mcf gas incl. casinghead
- 25
- bbl oil, last 12 reported
- —
- vs the 12 before
- 5
- wells completed on it
- 47
- peak month, bbl (Jan 1993)
PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME JUN 2012 · STATEWIDE DATA THROUGH APR 2026
Oil by month
Barrels reported on Form PR for the whole lease. The latest months are revised upward as late reports arrive.
Last 12 months 25 · prior 12 0
Gas by month
Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.
Last 12 months 0 · prior 12 0
Who reported it
Each run of months one operator filed the production report, oldest first.
- Sojourner Drilling CorporationJan 1993 → Sep 2012 · 237 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
5
wells completed on the lease
- Plugged
- 5
Operates them now
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/o-8-19650, documented in the API reference.