LEASES · O-8-2886 · OIL · DISTRICT 7B

Boyd -B-

No volume since Dec 1993

O'Ryan Oil and Gas · Nolan County · Dora, North (Ellenburger) field

Boyd -B- is an RRC oil lease (O-8-2886) in Nolan County operated by O'Ryan Oil And Gas, with 5 wells completed on it.

It has reported 2.52K barrels of oil and 3.24K mcf of gas since January 1993, last reporting volume in December 1993 (statewide data runs through April 2026).

No volume was reported in the 12 months through April 2026; the last was in December 1993.

2 operators have filed production on it, most recently O'Ryan Oil And Gas since October 1998.

2.52K
bbl oil, all reported
3.24K
mcf gas incl. casinghead
0
bbl oil, 12 months through Apr 2026
—
vs the 12 before
5
wells completed on it
333
peak month, bbl (Jan 1993)

PDQ LEASE REPORTS · FIRST JAN 1993 · LAST VOLUME DEC 1993 · STATEWIDE DATA THROUGH APR 2026

Oil by month

Barrels reported on Form PR for the whole lease. The latest months are revised upward as late reports arrive.

12 months through Apr 2026 0 · prior 12 0

02004001993199419951996199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020202120222023202420252026

Gas by month

Gas-well gas plus casinghead gas, mcf. On an oil lease all gas is reported as casinghead. The latest months are revised upward as late reports arrive.

12 months through Apr 2026 0 · prior 12 0

02004006001993199419951996199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020202120222023202420252026

Who reported it

Each run of months one operator filed the production report, oldest first.

  1. Laneer Resources CompanyJan 1993 → Sep 1998 · 69 mo
  2. O'Ryan Oil and GasOct 1998 → Aug 2011 · 155 mo

Wells on the lease

FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL

5

wells completed on the lease

Not on Schedule
3
Plugged
2

Operates them now

Newest permits

  • — #13—
  • — #18—
  • — #2—
  • — #20—
  • — #6—

All 5 wells, searchable →

About this data

Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.

Developers: this page as JSON is GET /v1/data/leases/tx/o-8-2886, documented in the API reference.