LEASES · O-8-29570 · OIL · DISTRICT 7B
Palmer
No volume since Apr 2017Sojourner Drilling Corporation · Fisher County · Fgy, SE. (Palo Pinto) field
Palmer is an RRC oil lease (O-8-29570) in Fisher County operated by Sojourner Drilling Corporation, with one well completed on it.
It has reported 40.9K barrels of oil since December 2004, last reporting volume in April 2017 (statewide data runs through April 2026).
No volume was reported in the last 12 months; the last was in April 2017.
2 operators have filed production on it, most recently Sojourner Drilling Corporation since September 2006.
- 40.9K
- bbl oil, all reported
- 0
- mcf gas incl. casinghead
- 0
- bbl oil, last 12 reported
- -100%
- vs the 12 before
- 1
- wells completed on it
- 1.3K
- peak month, bbl (Mar 2005)
PDQ LEASE REPORTS · FIRST DEC 2004 · LAST VOLUME APR 2017 · STATEWIDE DATA THROUGH APR 2026
Oil by month
Barrels reported on Form PR for the whole lease. The latest months are revised upward as late reports arrive.
Last 12 months 0 · prior 12 2,537(-100%)
Who reported it
Each run of months one operator filed the production report, oldest first.
- Seago Operating Co., L.L.C.Dec 2004 → Aug 2006 · 21 mo
- Sojourner Drilling CorporationSep 2006 → Jun 2018 · 142 mo
Wells on the lease
FROM COMPLETION REPORTS · PRODUCTION ABOVE IS THEIR TOTAL
About this data
Monthly oil, gas, and casinghead from the RRC PDQ production dump, which lags the reporting month by two to three months; figures shown through Apr 2026. Wells from completion reports; operator runs from who filed each month's report.
Developers: this page as JSON is GET /v1/data/leases/tx/o-8-29570, documented in the API reference.