NORWAY · FIELDS · NPDID 29398828

Troll Brent B

North Sea · Oil · Shut down · Operator Equinor Energy AS

Troll Brent B is an oil field in the North Sea operated by Equinor Energy AS, discovered in 2005 by wellbore 31/2-N-11 H. The Norwegian Offshore Directorate lists it as shut down.

5 companies hold it; the largest share is Petoro AS with 40.8%.

4 wellbores are on file for the field.

0
mill Sm³ o.e., last 12 reported
0
mill Sm³ oil, last 12
0
bill Sm³ gas, last 12
0
mill Sm³ o.e. since first report
4
wellbores on file
5
licensees today

SODIR PRODUCTION PROFILES · SALEABLE VOLUMES · REPORTED THROUGH AUG 2026

Licensees

SHARES TODAY · LICENCE 054

CompanyShareSince
Petoro AS40.8%Jun 18, 2021
A/S Norske Shell25.9%Jun 18, 2021
Equinor Energy ASOPERATOR24.418%Jun 18, 2021
ConocoPhillips Skandinavia AS5.191%Jun 18, 2021
TotalEnergies EP Norge AS3.691%Jun 18, 2021

Production licence 054: ownership history and register messages →

Reserves

THE DIRECTORATE'S ESTIMATE · AS OF DEC 31, 2025

These are the Norwegian Offshore Directorate's own year-end estimates, shown as it publishes them. Petrora does not estimate reserves.

Oil, mill Sm³Gas, bill Sm³NGL, mill tonnesCondensate, mill Sm³O.e., mill Sm³
Originally recoverable00000
Remaining00000

About the field

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

Development
Troll Brent B is a field near the Troll field in the northern part of the North Sea. The water depth is 340 metres. Troll Brent B was discovered in 2005, and was granted an exemption from the plan for development and operation (PDO) in 2017. Troll Brent B was planned to be developed with one multilateral production well drilled from the O-template connected to Troll C.
Reservoir
The reservoir contains oil in sandstone of Middle Jurassic age in the Brent Group, stratigraphically underlying producing reservoirs on the Troll field. The reservoir is at a depth of 1900 metres.
Recovery strategy
The field was planned to be produced by pressure depletion.
Transport
There was no production from Troll Brent B.
Status
During drilling of the production well, oil reserves were proven to be significantly lower than originally assumed. It was therefore decided to be uneconomical to start production on the Troll Brent B field. The well was plugged; however, the well slot is available to be used for potential new targets on Troll Vest.

Wellbores

Observation 2 · Production 2

All 4 wellbores in Troll Brent B, searchable → · Discovery wellbore 31/2-N-11 H →

Operator history

This field on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Production is saleable volume by month from the Directorate's profiles, cut at the latest month any field has reported; yearly and cumulative figures are those months added up. Shares are the current rows of the field's licensee history. Reserves are the Directorate's estimate.

Developers: this page as JSON is GET /v1/data/norway/fields/29398828, documented in the API reference.