NORWAY · LICENCES · NPDID 30676176
Production licence 942
Production licence 942 was granted Mar 2, 2018 in round TFO2017 in the Norwegian Sea. It is active, in the production phase, operated by Aker BP ASA with 3 licensees.
- Mar 2, 2018
- granted · valid to Sep 2, 2043
- 98
- km² today · 150 when granted
- 7
- wellbores · 2 exploration
- 11
- register messages
SODIR FACTPAGES · PETROLEUM REGISTER
Licensees today
Fields: Ørn
| Company | Interest | Since |
|---|---|---|
| ORLEN Upstream Norway AS | 40% | Sep 26, 2024 |
| Aker BP ASAOPERATOR | 30% | Sep 26, 2024 |
| Equinor Energy AS | 30% | Sep 26, 2024 |
Petroleum Register
11 MESSAGES · AS FILED, IN NORWEGIAN
The Petroleum Register is Norway's public record of rights in production licences. Every transfer of a share, change of operator, mortgage, extension, and lapse is entered there with its date. The Directorate publishes it in Norwegian only, so each entry is shown in its own words with a link to read it in English.
Nov 1, 2024 · Licensee name change · DOC 18783
PGNiG Upstream Norway AS har, i henhold til generalforsamlingsvedtak av 26.09.2024, endret foretaksnavn til ORLEN Upstream Norway AS.
Mar 13, 2024 · Mortgage of a licence or a share in one · DOC 18362
PGNiG Upstream Norway AS pantsetter sin 40 % deltakerandel i tillatelsen til fordel for Societe Generale.Pantobligasjon stor USD 1 200 000 000, skriver United States Dollars one billion two hundred million.Pantsetter har ikke rett til å overdra eller foreta ytterligere pantsettelser av pantsatte objekt uten skriftlig samtykke fra panthaver.Energidepartementet har i brev av 20.11.2023 gitt samtykke i medhold av petroleumsloven § 6-2 første ledd. Pantsettelsen utgjør et såkalt krysspant.
Jul 4, 2023 · Extension of the period of validity · DOC 17929
Olje- og energidepartementet bekrefter i brev datert 3.7.2023 at utvinningstillatelsen overføres til forlengelsesperioden med varighet til 2.9.2043. jf. petroleumsloven § 3-9 andre ledd
Sep 1, 2022 · Transfer of a licence or a share in one · DOC 17192
Wellesley Petroleum AS har overdratt sin 40 % andel i tillatelsen til PGNiG Upstream Norway AS. Iht. skjøte er gjennomføringsdato 31.8.2022 og virkningsdato 1.1.2022
Nov 1, 2021 · Change to licence (kept for historical reasons) · DOC 16216
Equinor Energy AS har overdratt en 10 % deltakerandel i tillatelsen til Wellesley Petroleum AS. Iht. skjøte er gjennomføringsdato 29.10.2021 og virkningsdato 1.1.2021
Oct 26, 2021 · Other messages · DOC 16207
Operatørskapet er overført fra Equinor Energy AS til Aker BP ASA med virkning fra 12.10.2021, i henhold til brev fra Aker BP AS datert 25.10.2021 og vedtaksbrev fra OED datert 16.9.2021, jf. petroleumsloven § 3-7 andre ledd.
Sep 23, 2021 · Change to licence (kept for historical reasons) · DOC 16181
Dok id 16179 slettes og operatørskap tilbakestilles til Equinor Energy AS.
Sep 21, 2021 · Change to licence (kept for historical reasons) · DOC 16179
Operatørskapet er overført fra Equinor Energy AS til Aker BP ASA, i henhold til vedtaksbrev fra OED datert 16.9.2021, jf. petroleumsloven § 3-7 andre ledd.
Mar 24, 2020 · Other messages · DOC 15274
Olje- og energidepartementet bekrefter i brev datert 24.3.2020 at initiell periode forlenges til 2.9.2023, jf. petroleumsloven § 3-9 første ledd.
May 16, 2018 · Other messages · DOC 13049
Statoil Petroleum AS har endret navn til Equinor Energy AS fra 16.5.2018.
Apr 23, 2018 · New licence · DOC 12652
Tillatelsen er innført i Petroleumsregisteret
Ownership history
EVERY INTEREST ON FILE · NEWEST FIRST
| Company | Interest | From | To |
|---|---|---|---|
| ORLEN Upstream Norway AS | 40% | Sep 26, 2024 | today |
| Aker BP ASA | 30% | Sep 26, 2024 | today |
| Equinor Energy AS | 30% | Sep 26, 2024 | today |
| PGNiG Upstream Norway AS | 40% | Aug 31, 2022 | Sep 25, 2024 |
| Aker BP ASA | 30% | Aug 31, 2022 | Sep 25, 2024 |
| Equinor Energy AS | 30% | Aug 31, 2022 | Sep 25, 2024 |
| Wellesley Petroleum AS | 40% | Oct 29, 2021 | Aug 30, 2022 |
| Aker BP ASA | 30% | Oct 29, 2021 | Aug 30, 2022 |
| Equinor Energy AS | 30% | Oct 29, 2021 | Aug 30, 2022 |
| Equinor Energy AS | 40% | May 16, 2018 | Oct 28, 2021 |
| Aker BP ASA | 30% | May 16, 2018 | Oct 28, 2021 |
| Wellesley Petroleum AS | 30% | May 16, 2018 | Oct 28, 2021 |
| Statoil Petroleum AS | 40% | Mar 2, 2018 | May 15, 2018 |
| Aker BP ASA | 30% | Mar 2, 2018 | May 15, 2018 |
| Wellesley Petroleum AS | 30% | Mar 2, 2018 | May 15, 2018 |
Operators
- Aker BP ASAOct 12, 2021 to today
- Equinor Energy ASMay 16, 2018 to Oct 11, 2021
- Statoil Petroleum ASMar 2, 2018 to May 15, 2018
Phases
- ProductionSep 3, 2023 to Sep 2, 2043
- Initial extendedMar 3, 2023 to Sep 2, 2023
- InitialMar 2, 2018 to Mar 2, 2023
Wellbores
7 ON FILE
| Wellbore | Purpose | Operator | Entered | TD, m | Content |
|---|---|---|---|---|---|
| 6507/2-O-2 H | Production | Aker BP ASA | Dec 11, 2025 | 5,263 | — |
| 6507/2-O-1 H | Production | Aker BP ASA | Dec 10, 2025 | 5,568 | — |
| 6507/2-8 | Wildcat | Aker BP ASA | Feb 9, 2025 | 4,288 | Dry |
| 6507/2-U-6 | Shallow gas | Aker BP ASA | Feb 8, 2025 | 792 | — |
| 6507/2-U-5 | Shallow gas | Aker BP ASA | Jul 27, 2024 | 1,415 | — |
| 6507/2-U-3 | Shallow gas | Aker BP ASA | Jun 6, 2023 | — | Not applicable |
| 6507/2-5 S | Wildcat | Equinor Energy AS | Jul 23, 2019 | 4,230 | Gas |
This licence on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Interests are the licence's licensee history; the rows with no end date are today's. Register messages are shown as the Petroleum Register files them, in Norwegian, which is the only language it is published in; the kind of message is labeled in English by Petrora, and the link beside each opens it in Google Translate.
Developers: this page as JSON is GET /v1/data/norway/licences/30676176, documented in the API reference.