NORWAY · LICENCES · NPDID 36464742

Production licence 1049

Production licence 1049 was granted Feb 14, 2020 in round TFO2019 in the North Sea. It is no longer active.

Feb 14, 2020
granted · valid to Aug 13, 2026
0
km² today · 590 when granted
2
wellbores · 1 exploration
19
register messages

SODIR FACTPAGES · PETROLEUM REGISTER

Petroleum Register

19 MESSAGES · AS FILED, IN NORWEGIAN

The Petroleum Register is Norway's public record of rights in production licences. Every transfer of a share, change of operator, mortgage, extension, and lapse is entered there with its date. The Directorate publishes it in Norwegian only, so each entry is shown in its own words with a link to read it in English.

  • Oct 22, 2026 · Lapse of licence · DOC 20316

    Energidepartementet bekrefter i brev datert 21.10.2026 at utvinningstillatelse 1049 anses som bortfalt med virkning fra og med 14.08.2026, jf. utvinningstillatelsens pkt. 4b) og departementets vedtak om forlengelse 11.03.2025.

    Read in English with Google Translate →

  • Dec 23, 2025 · Operator name change · DOC 19949

    Sval Energi AS har, i henhold til generalforsamlingsvedtak av 17.12.2025, endret foretaksnavn til DNO Norge AS. Denne endringen har virkning fra 17.12.2025, til tross for at registeret angir virkning fra 18.12.2025 (skyldes systemfeil)

    Read in English with Google Translate →

  • Dec 18, 2025 · Licensee name change · DOC 19845

    Sval Energi AS har, i henhold til generalforsamlingsvedtak av 17.12.2025, endret foretaksnavn til DNO Norge AS.

    Read in English with Google Translate →

  • Dec 18, 2025 · Change of operator · DOC 19768

    Operatørskapet er overført fra DNO Norge AS til Sval Energi AS, i henhold til vedtaksbrev fra Energidepartementet datert 12.09.2025, jf. petroleumsloven § 3-7 andre ledd.

    Read in English with Google Translate →

  • Dec 18, 2025 · Transfer of a licence or a share in one · DOC 19732

    DNO Norge AS og Sval Energi AS har fusjonert 17.12.2025. Alle andeler i DNO Norge AS er overtatt av Sval Energi AS. Energidepartementet har samtykket til fusjonen i brev datert 12.09.2025, jf. petroleumsloven § 10-12.

    Read in English with Google Translate →

  • Dec 11, 2025 ·  · DOC 19663

    Initiell periode (14.02.2020 - 17.08.2025) slettes da vi har lagt inn feil sluttdato som skal være 14.02.2025

    Read in English with Google Translate →

  • Jan 2, 2025 · Transfer of a licence or a share in one · DOC 19070

    Japex Norge AS har overdratt sin 25 % andel i tillatelsen til Concedo AS. Iht. skjøte er gjennomføringsdato 02.01.2025 og virkningsdato 01.01.2025.

    Read in English with Google Translate →

  • Jul 29, 2024 · Licensee name change · DOC 18660

    Longboat JAPEX Norge AS har endret foretaksnavn til JAPEX Norge AS med virkning fra 22.07.2024.

    Read in English with Google Translate →

  • Jan 31, 2024 · Transfer of a licence or a share in one · DOC 18176

    Longboat Japex Norge AS har overdratt en 15 % andel i tillatelsen til Concedo AS. Iht. skjøte er gjennomføringsdato 31.01.2024 og virkningsdato 01.01.2024.

    Read in English with Google Translate →

  • Nov 7, 2023 · Licensee name change · DOC 18117

    Longboat Energy Norge AS har, i henhold til generalforsamlingsvedtak av 14.7.2023, endret foretaksnavn til Longboat Japex Norge AS

    Read in English with Google Translate →

  • Sep 25, 2023 · Extension of the period of validity · DOC 18058

    Olje- og energidepartementet bekrefter i brev datert 30.6.2023 at initiell periode forlenges til 14.2.2030, jf. petroleumsloven § 3-9 første ledd.

    Read in English with Google Translate →

  • Jul 19, 2023 · Uttreden av tillatelse · DOC 17932

    I henhold til inngått endringsavtale og godkjenningsbrev fra OED datert 16.05.2023 har Equinor Energy AS og Sval Energi AS trådt ut av utvinningstillatelsen. Longboat Energy Norga AS har overtatt Equinor Energy AS deltakerandel på 35 % og Sval Energi AS deltakerandel på 20 % med virkning fra 14.02.2023.

    Read in English with Google Translate →

  • Jul 19, 2023 · Transfer of a licence or a share in one · DOC 17936

    Longboat Energy Norge AS har overdratt en 40 % andel i tillatelsen til DNO Norge AS. Iht. skjøte er gjennomføringsdato 14.07.2023 og virkningsdato 14.02.2023.

    Read in English with Google Translate →

  • Jul 19, 2023 · Change of operator · DOC 17939

    Operatørskapet er overført fra Equinor Energy AS til DNO Norge AS, i henhold til vedtaksbrev fra OED datert 30.06.2023, jf. petroleumsloven § 3-7 andre ledd.

    Read in English with Google Translate →

  • May 31, 2022 · Transfer of a licence or a share in one · DOC 16867

    Spirit Energy Norway AS har overdratt sin 20 % andel i tillatelsen til Sval Energi AS. Iht. skjøte er gjennomføringsdato 31.5.2022 og virkningsdato 1.1.2022

    Read in English with Google Translate →

  • Sep 1, 2021 · Change to licence (kept for historical reasons) · DOC 16155

    Spirit Energy Norway AS har overdratt en 20 % deltakerandel i tillatelsen til Longboat Energy Norge AS. Iht. skjøte er gjennomføringsdato 31.8.2021 og virkningsdato 1.1.2021.

    Read in English with Google Translate →

  • Aug 31, 2021 · Change to licence (kept for historical reasons) · DOC 16146

    Equinor Energy AS har overdratt en 5 % deltakerandel i tillatelsen til Longboat Energy Norge AS. Iht. skjøte er gjennomføringsdato 31.8.2021 og virkningsdato 1.1.2021

    Read in English with Google Translate →

  • Apr 2, 2020 · Extension of the period of validity · DOC 15331

    Tillatelsen er innført i Petroleumsregisteret

    Read in English with Google Translate →

  • Apr 2, 2020 · New licence · DOC 15331

    Tillatelsen er innført i petroleumsregisteret

    Read in English with Google Translate →

Ownership history

EVERY INTEREST ON FILE · NEWEST FIRST

CompanyInterestFromTo
Concedo AS40%Dec 17, 2025Aug 13, 2026
DNO Norge AS40%Dec 17, 2025Aug 13, 2026
Petoro AS20%Dec 17, 2025Aug 13, 2026
Concedo AS40%Jan 2, 2025Dec 16, 2025
DNO Norge AS (old)40%Jan 2, 2025Dec 16, 2025
Petoro AS20%Jan 2, 2025Dec 16, 2025
DNO Norge AS (old)40%Jul 22, 2024Jan 1, 2025
Japex Norge AS25%Jul 22, 2024Jan 1, 2025
Petoro AS20%Jul 22, 2024Jan 1, 2025
Concedo AS15%Jul 22, 2024Jan 1, 2025
DNO Norge AS (old)40%Jan 31, 2024Jul 21, 2024
Longboat Japex Norge AS25%Jan 31, 2024Jul 21, 2024
Petoro AS20%Jan 31, 2024Jul 21, 2024
Concedo AS15%Jan 31, 2024Jul 21, 2024
DNO Norge AS (old)40%Jul 14, 2023Jan 30, 2024
Longboat Japex Norge AS40%Jul 14, 2023Jan 30, 2024
Petoro AS20%Jul 14, 2023Jan 30, 2024
Longboat Energy Norge AS40%Feb 14, 2023Jul 13, 2023
DNO Norge AS (old)40%Feb 14, 2023Jul 13, 2023
Petoro AS20%Feb 14, 2023Jul 13, 2023
Equinor Energy AS35%May 31, 2022Feb 13, 2023
Longboat Energy Norge AS25%May 31, 2022Feb 13, 2023
Petoro AS20%May 31, 2022Feb 13, 2023
Sval Energi AS20%May 31, 2022Feb 13, 2023
Equinor Energy AS35%Aug 31, 2021May 30, 2022
Longboat Energy Norge AS25%Aug 31, 2021May 30, 2022
Spirit Energy Norway AS20%Aug 31, 2021May 30, 2022
Petoro AS20%Aug 31, 2021May 30, 2022
Spirit Energy Norway AS40%Feb 14, 2020Aug 30, 2021
Equinor Energy AS40%Feb 14, 2020Aug 30, 2021
Petoro AS20%Feb 14, 2020Aug 30, 2021

Operators

Phases

  • Initial extendedFeb 15, 2025 to Feb 14, 2030
  • InitialFeb 14, 2020 to Feb 14, 2025

Wellbores

2 ON FILE

WellborePurposeOperatorEnteredTD, mContent
34/9-1 SWildcatEquinor Energy ASApr 9, 20224,455Dry
34/9-U-1Shallow gasEquinor Energy ASApr 9, 20221,300—

All 2 wellbores on PL 1049, searchable →

This licence on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Interests are the licence's licensee history; the rows with no end date are today's. Register messages are shown as the Petroleum Register files them, in Norwegian, which is the only language it is published in; the kind of message is labeled in English by Petrora, and the link beside each opens it in Google Translate.

Developers: this page as JSON is GET /v1/data/norway/licences/36464742, documented in the API reference.