NORWAY · SAMPLES

Palynology slides on the Norwegian shelf

One row per palynology slide: depth, what it was made from (ditch cuttings, core, or sidewall core), and the laboratory code on it.

103,922 PALYNOLOGY SLIDES · PAGE 112 OF 2,079

WellboreDepthUnitMade fromLab codeOperatorEntered
30/8-5 Tune2,380 mVåle FmDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,420 mVåle FmDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,460 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,500 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,540 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,580 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,620 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,660 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,700 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,740 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,780 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,820 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,860 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,900 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,940 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune2,980 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,020 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,060 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,100 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,140 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,180 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,200 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,220 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,260 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,300 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,318 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,336 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,354 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,372 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,384 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,396 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,408 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,420 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,426 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,432 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,444 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,450 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,462 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,474 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,486 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,498 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,510 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,522 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,534 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,546 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,558 mShetland GpDitch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,564 m—Ditch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,570 m—Ditch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,576 m—Ditch cuttingsPETROSStatoil Petroleum ASDec 2, 2017
30/8-5 Tune3,582 m—Ditch cuttingsPETROSStatoil Petroleum ASDec 2, 2017

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Rows are the Directorate's own records per wellbore, ordered by the wellbore's entry date (fluid samples by test date). Availability is the Directorate's flag for the sample, not a stock check. The unit on each row is the one whose top and base, in that wellbore's own tops, contain the row's depth; where no top covers it the cell is blank. The unit filter on cores uses cored length per unit and wellbore, which is how the Directorate files it.

Developers: this page as JSON is GET /v1/data/norway/samples/paly-slides, documented in the API reference.