NORWAY · WELLBORES · NPDID 10029

6407/7-A-24 H

Development · Production · Producing · Gas · Equinor Energy AS · Njord · PL 107

6407/7-A-24 H is a production development wellbore in the Norwegian Sea, drilled by Equinor Energy AS, entered Nov 25, 2024, to 4,731 m.

Discovery 6407/7-1 S Njord · On the map →

4,731
m total depth
330
m water depth
Nov 25, 2024
entered · completed May 21, 2025
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 7, 2026 · RELEASED MAY 21, 2027

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
NJORD A · Semisub steel
Drilling days
29
Kelly bushing elevation
30 m
Maximum inclination
—°
Drilling permit
5629-P
Licensing round
9
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
64.27136° N, 7.20198° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10029, documented in the API reference.