NORWAY · WELLBORES · NPDID 10084

24/6-5 A

Development · Observation · Plugged · Oil · Aker BP ASA · Alvheim · PL 203

24/6-5 A is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered May 29, 2024, to 2,820 m.

Discovery 25/4-7 Alvheim · On the map →

2,820
m total depth · 2,217.7 m vertical
120
m water depth
May 29, 2024
entered · completed Jun 2, 2024
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUN 2, 2026

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
NOBLE INTEGRATOR · Jack-up 3 legs
Drilling days
5
Kelly bushing elevation
55 m
Maximum inclination
—°
Drilling permit
5663-P
Licensing round
15
Plugged and abandoned
Jun 2, 2024
Core samples available
No
Cuttings samples available
No
Position · ED50
59.53618° N, 1.97673° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10084, documented in the API reference.