NORWAY · WELLBORES · NPDID 1014

2/12-1

Exploration · Wildcat · P&A · Oil · Norsk Hydro Produksjon AS · PL 113

11 documents: reports, logs, and plots →

2/12-1 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Oct 14, 1986, to 4,795 m in the Rotliegend Gp.

Discovery 2/12-1 Mjølner · On the map →

4,795
m total depth · 4,793 m vertical
70
m water depth
Oct 14, 1986
entered · completed Mar 12, 1987
Rotliegend Gp
at total depth · Early Permian
37.9
m of core in 3 cores
151
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED MAR 12, 1989

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE SCOUT · Semisub steel
Drilling days
150
Kelly bushing elevation
23 m
Maximum inclination
4.4000001°
Drilling permit
530-L
Licensing round
10-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.23446° N, 3.70764° E
Hydrocarbons in
Ula Fm · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/12-1 is located in the Feda Graben n the southern North Sea, ca 1.5 m north of the Danish/Norwegian border. The main objective of the well was to prove the extension of the Danish "Gert" discovery into block 2/12. The primary target was Middle Jurassic sandstones, prognosed at 4826 m. Possible secondary targets were Early Jurassic and Triassic sandstones. Structural closure was not defined at Top Shetland or Base Cretaceous levels, but minor stratigraphic trapping was considered possible in this area. Prognosed TD was 5125 m.

Operations and results

Wildcat well 2/12-1 was spudded with the semi-submersible installation Treasure Scout on 14 October 1986 and drilled to TD at 4795 m in volcanic breccia of the Early Permian Rotliegend Group. Drilling proceeded without significant problems down to 3970 m where gas problems were experienced. The hole was cleaned up, and dual induction/sonic log was run. Due to increasing gas recordings 9 5/8" casing was set at 3978 m. The remaining logging program in this section was therefore not run, and sidewall cores were not taken. At 4705 m a drill- break was experienced. The hole was circulated, tested, and drilled to 4714 m. During logging the tool got stuck and the string was cut. The fish was stuck at 3842 m, and loosening was unsuccessful. 7" liner was set at 3826 m and cemented. During circulation hydrocarbons started to flow in between 9 5/8" shoe and 7" liner. The well was closed and heavy mud was squeezed into the formation. After 3 weeks the fish was pulled out of the hole. The well was drilled with spud mud down to 1015 m, with KCl/polymer mud from 1015 m to 4050 m, and with Lignosulphonate mud from 4050 m to TD

Well 2/12-1 encountered 71 m of o

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1014, documented in the API reference.