NORWAY · WELLBORES · NPDID 10232

7/1-4 S

Exploration · Wildcat · P&A · Dry · Vår Energi ASA · PL 1090

7/1-4 S is a wildcat exploration wellbore in the North Sea, drilled by Vår Energi ASA, entered Jan 30, 2025, to 2,516 m in the Hod Fm.

On the map →

2,516
m total depth · 2,512.8 m vertical
81
m water depth
Jan 30, 2025
entered · completed Feb 27, 2025
Hod Fm
at total depth · Late Cretaceous
—
m of core
109
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 20, 2026 · RELEASED FEB 18, 2026

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
COSLPioneer · Semisub steel
Drilling days
29
Kelly bushing elevation
25.1 m
Maximum inclination
7.57999992°
Drilling permit
2019-L
Licensing round
TFO2020
Plugged and abandoned
Feb 27, 2025
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
57.88777° N, 2.23185° E

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10232, documented in the API reference.