NORWAY · WELLBORES · NPDID 1030

25/1-8 SR

Exploration · Appraisal · Suspended · Gas · Elf Petroleum Norge AS · Frigg · PL 024

1 document: reports, logs, and plots →

25/1-8 SR is an appraisal exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Feb 14, 1987, to 2,650 m in the Lista Fm.

Discovery 25/1-1 Frigg · On the map →

2,650
m total depth · 2,572 m vertical
102
m water depth
Feb 14, 1987
entered · completed Feb 18, 1987
Lista Fm
at total depth · Paleocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 18, 1989

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
NORTRYM · Semisub steel
Drilling days
5
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
466-L2
Licensing round
2-A
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
59.90091° N, 2.10272° E
Hydrocarbons in
Frigg Fm · Eocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The Frigg Field was discovered by well 25/1-1 in 1971 and set in production in May 1977. Well 25/1-8 S was drilled in the summer of 1985 to monitor changes in gas/fluid contact, uncover permeability barriers and pressure gradients in the Frigg Formation, refine the geological model, and provide ties for seismic interpretations. Before production started the Frigg Field fluid contacts were: OWC = 1955.9 m TVD MSL and GOC = 1948.2 m TVD MSL. In July 1985 in 25/1-8 S found the oil-leg to be all swept with the exception of a very thin oil-layer lifted to 1903.5 m TVD MSL, 2 m below the new gas/liquid contact, which was now a gas/water contact (GWC) at 1901.3 m TVD MSL. The objective of the re-entry well 25/1-8 SR was to monitor further changes in the GWC.

Operations and results

Appraisal well 25/1-8 S was re-entered (25/1-8 SR) with the semi-submersible installation Nortrym on 14 February 1987.

The GWC was found at 1898.3 m TVD MSL, only 3.2 m higher than in July 1985. The slow water rise was attributed to a thin shale layer that acted as a barrier for effective drainage.

No cores were cut and no wire line fluid samples were taken.

The well was suspended on 18 February 1987 for later re-entry and monitoring of the reservoir parameters. It is classified as a gas appraisal well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.