NORWAY · WELLBORES · NPDID 10301

6607/12-P-3 H

Development · Production · Producing · Aker BP ASA · Alve Nord · PL 127 C

6607/12-P-3 H is a production development wellbore in the Norwegian Sea, drilled by Aker BP ASA, entered Jul 26, 2025, to 6,751 m.

Discovery 6607/12-2 S Alve Nord · On the map →

6,751
m total depth
369.7
m water depth
Jul 26, 2025
entered · completed Dec 3, 2025
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 3, 2027

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
SCARABEO 8 · Semisub steel
Drilling days
131
Kelly bushing elevation
33.7 m
Maximum inclination
—°
Drilling permit
5771-P
Licensing round
10-B
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
66.00143° N, 7.80150° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10301, documented in the API reference.