NORWAY · WELLBORES · NPDID 10386

7220/5-EB-1 Y1H

Development · Production · Online/operational · Equinor Energy AS · Johan Castberg · PL 532

7220/5-EB-1 Y1H is a production development wellbore in the Barents Sea, drilled by Equinor Energy AS, entered Feb 1, 2026.

Discovery 7220/8-1 Johan Castberg · On the map →

—
m total depth
389.5
m water depth
Feb 1, 2026
entered
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
TRANSOCEAN ENABLER · Semisub steel
Drilling days
0
Kelly bushing elevation
32.1 m
Maximum inclination
—°
Drilling permit
5839-P1
Licensing round
20
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
72.52381° N, 20.34665° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10386, documented in the API reference.