NORWAY · WELLBORES · NPDID 10388

16/2-D-6 Y2

Development · Production · Producing · Equinor Energy AS · Johan Sverdrup · PL 265

16/2-D-6 Y2 is a production development wellbore in the North Sea, drilled by Equinor Energy AS, entered Nov 6, 2025, to 4,711 m.

Discovery 16/2-6 Johan Sverdrup · On the map →

4,711
m total depth
113.4
m water depth
Nov 6, 2025
entered · completed Nov 27, 2025
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 23, 2026 · RELEASED NOV 27, 2027

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
JOHAN SVERDRUP DP · Jacket 8 legs
Drilling days
22
Kelly bushing elevation
74.3 m
Maximum inclination
—°
Drilling permit
4779-P2
Licensing round
NST2000
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
58.83600° N, 2.55351° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10388, documented in the API reference.